Tender Details

Particulars Details
Title
Fabrication And Erection Of Supporting Structure With Channel Joist And Plate Of Road Weigh Bridge (60 Te) And Different Type Of Work And Old Structure Dismantling With M.S Material Under Ktw
Description
Fabrication And Erection Of Supporting Structure With Channel Joist And Plate Of Road Weigh Bridge (60 Te) And Different Type Of Work And Old Structure Dismantling With M.S Material Under Ktw
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_329380_1
Reference
Number
PO/KTW/EnM/eTen/24-25/165 Dated-17.02.2025
Tender Fee 0
EMD 4900
Tender Value
Place Kathara Washery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341391
Start Date February 18, 2025 16:30
End Date

28/02/2025 ( Expired 76 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Read more
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s

Read more
Fdr / mtc. of bailey type unit steel bridges and installation of spun pipe at different locations under jatanbari pwd (randb) sub-division /sh- dismantling and launching bailey type unit steel bridge at jatanbari-lambacherra road(ch-20.50 km), provid

Fdr / mtc. of bailey type unit steel bridges and installation of spun pipe at different locations under jatanbari pwd (randb) sub-division /sh- dismantling and launching bailey type unit steel bridge at jatanbari-lambacherra road(ch-20.50 km), provid

Read more
Supply and fixing of 100 mt road weigh bridge digitizer(digital indicator) along with erection of steel pipe structure and for flexible gi pipe cunduiting of naked load cell cable from load cell to junction box in sayal-d project .

Supply and fixing of 100 mt road weigh bridge digitizer(digital indicator) along with erection of steel pipe structure and for flexible gi pipe cunduiting of naked load cell cable from load cell to junction box in sayal-d project .

Read more
Steel structural work for complete dismantling, fabrication and erection of deck sheets, chequered plates with supporting structure along with foundation strengthening in crusher house, conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii

Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in crusher house,conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii

Read more
Repairing/fabrication with dismantling and withdrawal of old and damaged mother(impact) plate fabrication with fitting of new mother (impact) plate and other related jobs of atlas copco make feeder breaker at dbocp.

Repairing/fabrication with dismantling and withdrawal of old and damaged mother(impact) plate fabrication with fitting of new mother (impact) plate and other related jobs of atlas copco make feeder breaker at dbocp.

Read more
Fabrication and erection of different sizes of new pontoons and repairing of old damaged 60 drum pontoons for installation of pumps, accessories shifting and cable laying near pontoon at different sumps of balram ocp, hingula area for a period of 365

Fabrication and erection of different sizes of new pontoons and repairing of old damaged 60 drum pontoons for installation of pumps, accessories shifting and cable laying near pontoon at different sumps of balram ocp, hingula area for a period of 365

Read more
Supply, installation and commissioning of 09(nine)nos. portable/flexible surface mounted road weigh bridge of capacity 120 mt along with bi-directional rfid based weighing system and associated civil work nd software integration in all respect at dvc

Supply, installation and commissioning of 09(nine)nos. portable/flexible surface mounted road weigh bridge of capacity 120 mt along with bi-directional rfid based weighing system and associated civil work nd software integration in all respect at dvc

Read more
Work of design and fabrication of new ms shade for staff quarters by dismantling old structure

Work of design and fabrication of new ms shade for staff quarters by dismantling old structure at pali hill reservoir

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise