Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Packing, Loading, Transporting, Of Pre Fab Bunk Type Office From Bhel Office Complex 25,16 A Noida, To Unloading, Unpacking, And Reinstallation At Bhel Karkhiyon, Varanasi (Up)
|
Description |
Dismantling, Packing, Loading, Transporting, Of Pre Fab Bunk Type Office From Bhel Office Complex 25 16 A Noida, To Unloading, Unpacking, And Reinstallation At Bhel Karkhiyon, Varanasi (Up)
|
Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
Tender Id | 2024_BHEL_33263_1 |
Reference Number |
AA NBP Pre fab office shifting 23 24 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | BHEL Complex, plot 25, sector 16A, Noida |
Link | https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=34781 |
Start Date | February 21, 2024 23:30 |
End Date |
28/02/2024 ( Expired 465 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual work of sweeping and cleaning in all type of drtain,common roads and work of daily door to door collection of garbage etc. from residential quarters situated in colony premises at atps chachai.
Annual work of sweeping and cleaning in all type of drtain,common roads and work of daily door to door collection of garbage etc. from residential quarters situated in colony premises at atps chachai.
Read moreCwe bly/ge(e)/04 of 25-26 spl repair to internal road from office area to aps gate, aps gate to mi room chowk, single offrs md accn and wksp, a charge main gate to a charge animal lines and between brake stable to fariery shop at rts and depot hempur
Cwe bly/ge(e)/04 of 25-26 spl repair to internal road from office area to aps gate, aps gate to mi room chowk, single offrs md accn and wksp, a charge main gate to a charge animal lines and between brake stable to fariery shop at rts and depot hempur
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreClearance of wild growth from the slopes of pph building, banks and removal of climbers and wild growth up to 5 ft. outside the periphery of security fencing around pong power house, s and t store, 220 kv switchyard and penstocks at pph talwara.
Clearance of wild growth from the slopes of pph building, banks and removal of climbers and wild growth up to 5 ft. outside the periphery of security fencing around pong power house, s and t store, 220 kv switchyard and penstocks at pph talwara.
Read moreEngaging an agency for excavation, collection, loading and transportation of mineral sand from vt/ponmana mining area and unloading near to spiral plant at vt mining site
Engaging an agency for excavation, collection, loading and transportation of mineral sand from vt/ponmana mining area and unloading near to spiral plant at vt mining site
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreTnpdcl head quarters complex maintenance and up keeping of all office floors and open areas in tantransco building inside tneb head quarters complex premises for a period of two years (2025-27) from the date of commencement.
Tnpdcl head quarters complex maintenance and up keeping of all office floors and open areas in tantransco building inside tneb head quarters complex premises for a period of two years (2025-27) from the date of commencement.
Read moreR and r of defects and deficiencies in the project stretch eastern peripheral expressway (epe) ne 2 from km. 93.000 to km. 136.000 in up and hr at the risk and cost of tot concessionaire as per the provisions of clause 15.9 of the ca
R and r of defects and deficiencies in the project stretch eastern peripheral expressway (epe) ne 2 from km. 93.000 to km. 136.000 in up and hr at the risk and cost of tot concessionaire as per the provisions of clause 15.9 of the ca
Read moreR and r of defects and deficiencies in the project stretch eastern peripheral expressway (epe) ne 2 from km. 46.500 to km. 93.000 in up at the risk and cost of tot concessionaire as per the provisions of clause 15.9 of the ca.
R and r of defects and deficiencies in the project stretch eastern peripheral expressway (epe) ne 2 from km. 46.500 to km. 93.000 in up at the risk and cost of tot concessionaire as per the provisions of clause 15.9 of the ca.
Read moreR and r of defects and deficiencies in the project stretch eastern peripheral expressway ne 2 from km 1.000 to km 46.500 in hr and up at the risk and cost of tot concessionaire as per the provisions of clause 15.9 of the ca
R and r of defects and deficiencies in the project stretch eastern peripheral expressway ne 2 from km 1.000 to km 46.500 in hr and up at the risk and cost of tot concessionaire as per the provisions of clause 15.9 of the ca
Read moreof your Industry type