Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ahp Removal Of Accumulated Collected Ash In Newly Constructed Culvert E Of Stage Iii
|
| Description |
Ahp Removal Of Accumulated Collected Ash In Newly Constructed Culvert E Of Stage Iii And Nearby Area Adjacent Of Compound Wall Removal Of All Jungles Scrubs And Debris For Laying And Erection Of Stage Iii Ash Disposal Pipe Line Inside Nctps I Prem
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_334908_1 |
|
Reference Number |
SE/M.II/NCTPS-I/SpNo32/2023-24 |
| Tender Fee | 0 |
| EMD | 4400 |
| Tender Value | - |
| Place | O/o SE/MII/NCTPS-I |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | July 03, 2023 22:30 |
| End Date |
Expired
10/07/2023
Expired 1194 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mechii ahp unit iii cleaning of ash slurry sluice sump of unit iii during the forthcoming annual overhaul
Ttps mechii ahp unit iii cleaning of ash slurry sluice sump of unit iii during the forthcoming annual overhaul
Read moreTtps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Read moreSpare vacuum contactor for stage-ii/iii ash slurry pump house for ntpc vindhyachal
Spare vacuum contactor for stage-ii/iii ash slurry pump house for ntpc vindhyachal
Read moreTtps mech ii ahp unit iii annual overhauling works cleaning of ash water pump house sump during the forthcoming annual overhaul
Ttps mech ii ahp unit iii annual overhauling works cleaning of ash water pump house sump during the forthcoming annual overhaul
Read moreProcurement of ash slurry pump complete assembly without motor, model-ar300/750a, for stage-ii, under ahp-mm, ktps (capex-fy-26-27).
Procurement of ash slurry pump complete assembly without motor, model-ar300/750a, for stage-ii, under ahp-mm, ktps (capex-fy-26-27).
Read moreTtps mechii ahp ash slurry disposal lines of unit iv v scrapping removal of ash slag under the culverts near unit iv v entrance 457 5 e road crossing and cleaning of pipes in all ash slurry disposal lines
Ttps mechii ahp ash slurry disposal lines of unit iv v scrapping removal of ash slag under the culverts near unit iv v entrance 457 5 e road crossing and cleaning of pipes in all ash slurry disposal lines
Read moreTtps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Ttps mechii ahp dismantling the existing wornout ms structural supports fabrication and erection of newly fabricated m.s. structural platform near jt3 in ash slurry disposal lines in unit iv v
Read moreTtps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Ttps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Read moreTtpsmechii bm unit iii removal of ash accumulated over the mechanical dust collector path a b c d and id fan a b suction side ducts and welding the eroded weld joints in the mechanical dust collector path a b c d and suction side duct of id fan ab
Ttpsmechii bm unit iii removal of ash accumulated over the mechanical dust collector path a b c d and id fan a b suction side ducts and welding the eroded weld joints in the mechanical dust collector path a b c d and suction side duct of id fan ab
Read moreTtps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Ttps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Read moreof your Industry type