Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Existing Sewage Treatment Plants (St Ps) To Meet Cpheeo, Ngt And Mppcb Norms For Treated Water Discharge And Reuse
|
| Description |
Existing Sewage Treatment Plants (St Ps) To Meet Cpheeo, Ngt And Mppcb Norms For Treated Water Discharge And Reuse
|
| Organisation | Directorate Urban Administration and Development | State Govt. and UT |
| Tender Id | 2025_UAD_463635_1 |
|
Reference Number |
USCL/408 |
| Tender Fee | 1180 |
| EMD | 0 |
| Tender Value | - |
| Place | Ujjain |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=545160 |
| Start Date | November 19, 2025 22:30 |
| End Date |
Expired
04/12/2025
Expired 317 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of 5 mld treated sewage from 10 mld stp peelakhar for reuse at waste to energy plant,
Supply of 5 mld treated sewage from 10 mld stp peelakhar for reuse at waste to energy plant,&#x0d kuberpur, agra&#x0d
Read moreSupply of 5 mld treated sewage from 10 mld stp peelakhar for reuse at waste to energy plant, kuberpur.
Supply of 5 mld treated sewage from 10 mld stp peelakhar for reuse at waste to energy plant, kuberpur.
Read morePreparation of detailed project report (dpr) for upgradation of treated effluent as per prescribed norms of ngt and increasing capacity of existing 7.5 mld asp stp.
Preparation of detailed project report (dpr) for upgradation of treated effluent as per prescribed norms of ngt and increasing capacity of existing 7.5 mld asp stp upto 10 mld at pali.
Read moreDesign, built, operate and transfer modular/ sewage treatment plant of 2 mld capacity to treat the discharge of najafgarh drain to the guaranteed effluent characteristics as per ngt norms and all allied infrastructure including supply, installation
N.i.t. no. 01(2025-26) ee(c)dr-vi
Read moreDesign engineering supply erection construction testing commissioning operation and maintenance of recycling reuse of treated waste water from yamuna nagar sewage treatment plants
Design engineering supply erection construction testing commissioning operation and maintenance of recycling reuse of treated waste water from yamuna nagar sewage treatment plants
Read moreEngagement of consultancy firm for feasibility study, preparation of dpr and bid process management for reuse of treated wastewater from ulbs stps for mpidc industrial water demand
Engagement of consultancy firm for feasibility study, preparation of dpr and bid process management for reuse of treated wastewater from ulbs stps for mpidc industrial water demand
Read moreDbo tender for tertiary treatment of sewage for industrial reuse at taloja midc. milestone 1 (phase 1) comprising of 50 mld kalamboli stp refurbishment with additional works, 20 mld tertiary treatment plant, 20 mld tertiary treated sewage pumping
Dbo tender for tertiary treatment of sewage for industrial reuse at taloja midc. milestone-1 (phase-1) comprising of 50 mld kalamboli stp refurbishment with additional works, 20 mld tertiary treatment plant, 20 mld tertiary treated sewage pumping
Read moreConstruction of sewerage system and reuse of treated sewage for jagruti vihar colony, mcl hq including the operation and maintenance for 3 years under the mini smart city scheme. turnkey tender
Construction of sewerage system and reuse of treated sewage for jagruti vihar colony, mcl hq including the operation and maintenance for 3 years under the mini smart city scheme. turnkey tender
Read moreUpgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated
Upgradation of existing 100 mld sewerage treatment plant and construction of 75 mld tertiary treatment unit at dhanwapur sewage treatment works with operation and maintenance for 5 years after 12 months defect liability period for reuse of treated ef
Read moreDesign, construction, testing, and commissioning of a total of 41 nos. stps comprising 18 nos. of new stps and 23 nos. (12 nos. rebuild 11 nos. modification of existing stps) of various capacities with forced bed aerated wetland technology to meet/comply with moefcc/cpcb/tgpcb/sbm 2.0 cpheeo guidelines for output water quality, including supplying, laying, and jointing of new sewer network of required length to connect with the existing network for 18 new stps, including manholes, etc., dul
Design, construction, testing, and commissioning of a total of 41 nos. stps comprising 18 nos. of new stps and 23 nos. (12 nos. rebuild and 11 nos. modification of existing stps) of various capacities with forced bed aerated wetland technology to meet/comply with moefcc/cpcb/tgpcb/sbm 2.0 /cpheeo guidelines for output water quality, including supplying, laying, and jointing of new sewer network of required length to connect with the existing network for 18 new stps, including manholes, etc., duly vetting the civil structural designs/structural drawings submitted by the firms from reputed govt. institutions/organizations like ou/nits/iits/iiits/jntuh, etc., and dismantling of 254 nos. defunct community septic tanks, and to provide 50 nos. of iot (internet of things) systems with online monitoring for performance monitoring, etc., with centralized dashboards, including comprehensive operation and maintenance for a period of 05 (five) years after successful trial of 02 (two) months
Read moreof your Industry type