Tender Details
About Tender
π Invitation For Bids: Guntakal Division Railway Overhead Bridges Project ππ£οΈ The Ministry Of Railways, Central Government, Invites Bids For The Construction Of Various Railway Overhead Bridges (Ro Bs) Under The Guntakal Division. ποΈ π Bid Submission Deadline: July 17, 2024, 3:00 Pm π Tender Fee: Inr 82,300 Interested Bidders Are Required To Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, For The Following Works: (I) 2 Lane Rob At Rly Km 62/3 4 (Ii) 2 Lane Rob With A 60m Bowstring Girder And Subway At Km 109/5 6 (Iii) 2 Lane Rob At Rly Km 37/11 12 (Iv) Modification Works To Ohe In Connection With The Proposed Construction Bidders Must Adhere To The Detailed Tender Documents For Complete Scope And Requirements. Keywords: Railway Overhead Bridges, Guntakal Division, Construction, Ministry Of Railways, Infrastructure Development, Civil Works, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Guntakal Division (I) Proposed Construction Of 2 Lane Rob At Rly Km 62/3 4 Between Kalasamudram And Kadiri Stations In Dmm Pak Section (Ii)proposed Construction Of 2 Lane Rob Of 60 M Bow String Girder And Subway (5.5x3.5) In Lieu Of Lc No. 67 At Km. 109/5 6 Between Mulakalacheruvu Tummanagunta Stations (Iii)proposed Construction Of 2 Lane Rob At Rly Km 37/11 12 Between Mudigubba And Malakavemula Stations On Dmm Pak Section. (Iv) Modification Works To Ohe In Connection With Proposed Constru
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75854451 |
Reference Number |
GTL-TRD-29-eTN-11-2024-25 |
Tender Fee | 0 |
EMD | 82300 |
Tender Value | |
Place | Secunderabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75854451/viewNitPdf_4616452.pdf |
Start Date | June 25, 2024 01:55 |
End Date |
17/07/2024 ( Expired 299 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreConstruction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreConstruction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreConstruction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Construction of 2-lane with paved shoulder greenfield bypass for lalganj ajhara-mohanganj and raniganj on raebareli-jaunpur section (design km 0.000 to 53.177) of nh 31 in the state of uttar pradesh on hybrid annuity mode
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreWidening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Widening of existing road 2 laning stretch into 4 lane configuration in phaltan city ch 138 250 to ch 144 425 and construction of new rob at km 179 730 existing km 61 100 of nh 965 in the state of maharashtra
Read moreof your Industry type