Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Replacement Of Water Supply Pipeline From Ugr To Ohr Along With Ring Main And Overhead Tanks At Type I And Type Ii Quarter Under Malda Mch Campus In The District Of Malda West Bengal During The Year 2024 25
|
Description |
Replacement Of Water Supply Pipeline From Ugr To Ohr Along With Ring Main And Overhead Tanks At Type I And Type Ii Quarter Under Malda Mch Campus In The District Of Malda West Bengal During The Year 2024 25
|
Organisation | WEST BENGAL MEDICAL SERVICES CORPORATION LIMITED | State Govt. and UT |
Tender Id | 2024_WBMSC_745513_1 |
Reference Number |
WBMSCL/NIT-496/2024 Dated 05/09/2024 |
Tender Fee | 0 |
EMD | 22962 |
Tender Value | |
Place | Malda MCH |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1647674 |
Start Date | September 06, 2024 21:30 |
End Date |
23/09/2024 ( Expired 285 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreWater supply scheme of jjm /sh- extension of pipeline of dws scheme and other allied works at different g.p/v.c under matabari block under dws sub- division no ii during the year 2024-25. (gr-ii)
Water supply scheme of jjm /sh- extension of pipeline of dws scheme and other allied works at different g.p/v.c under matabari block under dws sub- division no ii during the year 2024-25. (gr-ii)
Read moreEmergent restoration of superstructure and foundation of gairganda bridge including protection work at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase- ii
Emergent restoration of superstructure and foundation of gairganda bridge including protection work at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase- ii
Read moreEmergent restoration work for approach and piers of gairganda bridge at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase-i
Emergent restoration work for approach and piers of gairganda bridge at chainage 2.200 kmp of nh-317 near birpara, in the district of alipurduar, west bengal, during the year 2025-26. phase-i
Read moreAAAAAAAAAA
Login to viewSanitary wash along with some repairing works inside the pwd type vi residential quarter no 08, 13 and 16 etc. along with anti termite work for qtr. no 11 and inside the kolkata north sub division i office during the year 2025 2026.
Read moreAAAAAAAAAA
Login to viewRepair and maintenance works of security shed and main gate of office campus under nadia highway division no.-i, pw(roads) dte. in the district of nadia during the year 2025-2026
Read moreRepair maintenance replacement of any type pumps motors borewells submersible and external water supply distribution networks along with allied works including cleaning of ug semi ug oh tanks etc at rci technicak area under ge i rci rnd rci h
Repair maintenance replacement of any type pumps motors borewells submersible and external water supply distribution networks along with allied works including cleaning of ug semi ug oh tanks etc at rci technicak area under ge i rci rnd rci h
Read moreStructural retrofitting of existing overhead and underground water reservoirs of quarter side at iimc campus in the state of west bengal
Structural retrofitting of existing overhead and underground water reservoirs of quarter side at iimc campus in the state of west bengal
Read moreAAAAAAAAAA
Login to viewCon of border security fencing from phase ii/iii to new design fence in west bengal between bp no. 243/mp to 764/2-s (length 210.028 km). sh- in various stretches from bp no. 355/2-s to 357/1-s (4.725 km), 361/m to 365/m (6.329 km), 385/2-s to 385/5-s (0.800 km), near bp no. 399/8-r (0.030 km), 401/6-s to 402/2-s (0.180 km) and 409/5-s to 417/8-s (15.383 km). (total length 27.447 km including intermediate bops reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along indo bangladesh border in the district of uttar dinajpur, west bengal. (package-v) in epc mode-iii. sw- providing services of watch ward for the cpwd office campus of border fencing division-ii, cpwd(ibbz-i), islampur.
Read moreSupply installation testing and commissioning of bpc flow meter with humidifier along with matching adapter as existing(pb type) at malda mch of west bengal
Supply installation testing and commissioning of bpc flow meter with humidifier along with matching adapter as existing(pb type) at malda mch of west bengal
Read moreof your Industry type