Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Intake Channel And Outlet Channel, Chain Link Fencing, Crates Work For Re Construction Of Old Water Reservoir Badi Biri Bearass Drass.
|
Description |
Construction Of Intake Channel And Outlet Channel, Chain Link Fencing, Crates Work For Re Construction Of Old Water Reservoir Badi Biri Bearass Drass.
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 240 |
EMD | 48480 |
Tender Value | |
Place | kargil |
Link |
AAAAAAAAAA Login to view |
Start Date | May 07, 2025 18:00 |
End Date |
17/05/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreDesign, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable.........
Design, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable ........
Read morePlanning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maint. for 05 yrs for central hospital residential colony old and new on turnkey basis.
Planning, design, engineering, construction, supply, installation and commissioning of sewerage treatment plant, sewer network and plant room with operation and maint. for 05 yrs for central hospital residential colony old and new on turnkey basis.
Read moreRe-construction of damaged portion of revetment wall of tower no 132, 130, 06 and 44 of 220kv alusteng-drass- transmission line.
Re-construction of damaged portion of revetment wall of tower no 132, 130, 06 and 44 of 220kv alusteng-drass- transmission line.
Read moreRemoval and development of the old existing borewell and replacement of all connected items for the water supply at mtrdc residential area and provision of new borewell for the maintenance of existing arboricuture and lanscaping works at phase i
Removal and development of the old existing borewell and replacement of all connected items for the water supply at mtrdc residential area and provision of new borewell for the maintenance of existing arboricuture and lanscaping works at phase i
Read moreConstruction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreBalance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Balance work on risk and cost of the contractor under construction of major high-level bridge across panvel-mahad-panjim road nh-66 (old-17) at km 91.400 god river, km 94.400 kal river and km 161.400 choradi river on nh-66 in raigad district in the s
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read moreof your Industry type