Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Property Development At 6th Floor (Terrace Floor) At Millennium City Centre Gurugram Metro Stations Of Line 2.
|
| Description |
Property Development At 6th Floor (Terrace Floor) At Millennium City Centre Gurugram Metro Stations Of Line 2.
|
| Organisation | Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_DMRC_830957_1 |
|
Reference Number |
CPD-139 |
| Tender Fee | 23600 |
| EMD | 6.3 Lakh |
| Tender Value | - |
| Place | Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=873176 |
| Start Date | November 11, 2024 16:30 |
| End Date |
Expired
02/12/2024
Expired 662 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Property development at 6th floor (terrace floor) at millennium city centre metro stations of line-2.
Property development at 6th floor (terrace floor) at millennium city centre metro stations of line-2.
Read moreRemoval of old rusted ms pipes from the shafts and installation of upvc pipes in the shafts from terrace to basement at millennium city centre gurugram station.
Removal of old rusted ms pipes from the shafts and installation of upvc pipes in the shafts from terrace to basement at millennium city centre gurugram station.
Read moreRepair of viaduct walkway and subsequent painting with anti-carbonation paint from qutub minar to millennium city centre gurugram metro stations of line-2 (2 years).
Repair of viaduct walkway and subsequent painting with anti-carbonation paint from qutub minar to millennium city centre gurugram metro stations of line-2 (2 years).
Read moreMaintenance of civil work- addition, alteration, and modification of various buildings, viaduct and stations from guru dronacharya to millennium city centre gurugram metro station including gurugram staff quarter in line-2s (for 3 years).
Maintenance of civil work- addition, alteration, and modification of various buildings, viaduct and stations from guru dronacharya to millennium city centre gurugram metro station including gurugram staff quarter in line-2s (for 3 years).
Read moreGeotechnical investigation for the 12.76 kms portion with 13 stations from millennium city centre to sector 9 (incl.) of elevated corridor (28.5 km) from millennium city centre to cyber city (26.65 kms) with a spur (1.85 km) to sector 101 gurugram
Geotechnical investigation for the 12.76 kms portion with 13 stations from millennium city centre to sector 9 (incl.) of elevated corridor (28.5 km) from millennium city centre to cyber city (26.65 kms) with a spur (1.85 km) to sector 101 gurugram
Read moreDevelopment and maintenance of horticulture work from udyog bhawan to millennium city centre gurugram in line-2 south section including sultanpur depot, rss at chtp and hcc and gurugram staff quarter for 3 years.
Development and maintenance of horticulture work from udyog bhawan to millennium city centre gurugram in line-2 south section including sultanpur depot, rss at chtp and hcc and gurugram staff quarter for 3 years.
Read moreReplacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Read moreCivil contract for miscellaneous maintenance works at udyog bhawan to millennium city centre metro station and allied buildings.
Civil contract for miscellaneous maintenance works at udyog bhawan to millennium city centre metro station and allied buildings.
Read moreEngagement of detailed design consultants for proof checking of civil structural works for corridor of 28.5 km length having 27 stations (main corridor from millennium city centre to cyber city, gurugram
Engagement of detailed design consultants for proof checking of civil structural works for corridor of 28.5 km length having 27 stations (main corridor from millennium city centre to cyber city, gurugram
Read moreFire pipe line maintenance work from udyog bhawan to millennium city centre, sultanpur depot and gurugram staff quarter and ptm line maintenance work from ctst to saket in l-2 south (for 3 years).
Fire pipe line maintenance work from udyog bhawan to millennium city centre, sultanpur depot and gurugram staff quarter and ptm line maintenance work from ctst to saket in l-2 south (for 3 years).
Read moreof your Industry type