Tender Details

Particulars Details
Title
Property Development At 6th Floor (Terrace Floor) At Millennium City Centre Gurugram Metro Stations Of Line 2.
Description
Property Development At 6th Floor (Terrace Floor) At Millennium City Centre Gurugram Metro Stations Of Line 2.
Organisation Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department
Tender Id 2024_DMRC_830957_1
Reference
Number
CPD-139
Tender Fee 23600
EMD 6.3 Lakh
Tender Value -
Place Delhi
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=873176

Start Date November 11, 2024 16:30
End Date
Expired 02/12/2024

Expired 684 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of viaduct and elevated stations of gurugram metro rail limited

Construction of viaduct and elevated stations from sector 9 metro station (exclusive) to cyber city metro station (inclusive) of gurugram metro corridor between millennium city centre and cyber city, gurugram, india.

Read more
Letting out of office/commercial space at operation control centre (occ) building (ground and first floor) of kochi water metro at vyttila on license basis through e tender

Letting out of office/commercial space at operation control centre (occ) building (ground and first floor) of kochi water metro at vyttila on license basis through e tender

Read more
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - metro rail stations and depot sitc of wall floor mounted power supply boxes and cables etc required for vrf outdoor units at elevated stations and fire pump panel at t..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - metro rail stations and depot sitc of wall floor mounted power supply boxes and cables etc required for vrf outdoor units at elevated stations and fire pump panel at t..

Read more
Property development at 6th floor (terrace floor) at millennium city centre metro stations of line-2.

Property development at 6th floor (terrace floor) at millennium city centre metro stations of line-2.

Read more
Removal of old rusted ms pipes from the shafts and installation of upvc pipes in the shafts from terrace to basement at millennium city centre gurugram station.

Removal of old rusted ms pipes from the shafts and installation of upvc pipes in the shafts from terrace to basement at millennium city centre gurugram station.

Read more
Repair of viaduct walkway and subsequent painting with anti-carbonation paint from qutub minar to millennium city centre gurugram metro stations of line-2 (2 years).

Repair of viaduct walkway and subsequent painting with anti-carbonation paint from qutub minar to millennium city centre gurugram metro stations of line-2 (2 years).

Read more
Maintenance of civil work- addition, alteration, and modification of various buildings, viaduct and stations from guru dronacharya to millennium city centre gurugram metro station including gurugram staff quarter in line-2s (for 3 years).

Maintenance of civil work- addition, alteration, and modification of various buildings, viaduct and stations from guru dronacharya to millennium city centre gurugram metro station including gurugram staff quarter in line-2s (for 3 years).

Read more
Geotechnical investigation for the 12.76 kms portion with 13 stations from millennium city centre to sector 9 (incl.) of elevated corridor (28.5 km) from millennium city centre to cyber city (26.65 kms) with a spur (1.85 km) to sector 101 gurugram

Geotechnical investigation for the 12.76 kms portion with 13 stations from millennium city centre to sector 9 (incl.) of elevated corridor (28.5 km) from millennium city centre to cyber city (26.65 kms) with a spur (1.85 km) to sector 101 gurugram

Read more
Development and maintenance of horticulture work from udyog bhawan to millennium city centre gurugram in line-2 south section including sultanpur depot, rss at chtp and hcc and gurugram staff quarter for 3 years.

Development and maintenance of horticulture work from udyog bhawan to millennium city centre gurugram in line-2 south section including sultanpur depot, rss at chtp and hcc and gurugram staff quarter for 3 years.

Read more
Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).

Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise