Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Production And General Arrangements At Engineer 24
|
| Description |
General Production And General Arrangements At Engineer 24
|
| Organisation | National Institute of Technology, Karnataka (NITK) | Central Govt. Ministry/Department |
| Tender Id | 2024_NITK_773943_1 |
|
Reference Number |
915/NITK/DSW/ENGI-24 |
| Tender Fee | 0 |
| EMD | 9000 |
| Tender Value | - |
| Place | NITK Surathkal |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1077862 |
| Start Date | October 04, 2024 16:15 |
| End Date |
Expired
14/10/2024
Expired 713 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreUpgradation of sri jayadeva hospital 400 bed to 600 bed at sjicsr campus krs road, mysuru.
Upgradation of sri jayadeva hospital 400 bed to 600 bed at sjicsr campus krs road, mysuru.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreGeneral- kinfra- water supply arrangements from the intake pond at kinfra industrial park mattannur -general civil work general- kinfra- water supply arrangements from the intake pond at kin
Construction of well, motor house and electrification
Read more2) general - chief engineer office at kamaleswaram - modification to internal seating arrangements - general civil work
Internal seating arrangements
Read moreGeneral-blind school olassa,kottayamtactile arrangements at blind school,olassageneral civil work
The&#x0d items included in this estimate are,dismantling&#x0d tiles,pcc,tactile ,mancoolies etc
Read moreof your Industry type