Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Flyover At Sidhauli (Biswa Sadan Tiraha) Km. 446.370 On Sitapur Lucknow Sec. Nh 30 (Old Nh 24) In The State Of Uttar Pradesh On Epc Mode
|
| Description |
Construction Of Flyover At Sidhauli (Biswa Sadan Tiraha) Km. 446.370 On Sitapur Lucknow Sec. Nh 30 (Old Nh 24) In The State Of Uttar Pradesh On Epc Mode
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_NHAI_166415_1 |
|
Reference Number |
25001/RO-W-UP/L-S/EPCTender/BS |
| Tender Fee | 10000 |
| EMD | 42.29 Lakh |
| Tender Value | - |
| Place | LUCKNOW |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | September 01, 2023 23:30 |
| End Date |
Expired
16/10/2023
Expired 1095 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.
Construction of 6 lane vehicular underpasses at km 306.930 (tilhar bypass) and km 347.595 (ucholiya) for permanent rectification of morth identified blackspot on bareilly-sitapur section of nh-30 (old nh-24 in the state of uttar pradesh on epc mode.
Read moreConstruction of flyover for long-term rectification of morth notified accident blackspot at palasi zero mile more, nh-27 km 212.000/nh-527 km 0.000, araria district, bihar on epc mode
Construction of flyover for long-term rectification of morth notified accident blackspot at palasi zero mile more, nh-27 km 212.000/nh-527 km 0.000, araria district, bihar on epc mode
Read moreConstruction of rcc drain from bade chauraha to mitthan ki dukaan to balaji gas agency on jahangirabad road and from amru hotel to bank of india on sidhauli road at npp bishwan distt sitapur
Construction of rcc drain from bade chauraha to mitthan ki dukaan to balaji gas agency on jahangirabad road and from amru hotel to bank of india on sidhauli road at npp bishwan distt sitapur
Read moreTreatment of 30 nos of landslide locations from km 64.380 to km 186.085 on nh-09 (old nh-125) in the state of uttarakhand under epc mode in nh(o) annual plan 2026-27
Treatment of 30 nos of landslide locations from km 64.380 to km 186.085 on nh-09 (old nh-125) in the state of uttarakhand under epc mode in nh(o) annual plan 2026-27
Read moreConstruction of 4 l of ujjain jhalawar sec of nh 552g from ch.0.000 village khilchipura to ch.86.500 village aakli kadiya (pkg 1) in the state of madhya pradesh on epc mode under nh(o).
Construction of 4 l of ujjain jhalawar sec of nh 552g from ch.0.000 village khilchipura to ch.86.500 village aakli kadiya (pkg 1) in the state of madhya pradesh on epc mode under nh(o).
Read moreConstruction of the flyover at ch. 59.200 on ranakpur highway junction and at ch 93.835 on pacific junction on pindwara udaipur section of nh 27 in the state of rajasthan on epc mode
Construction of the flyover at ch. 59.200 on ranakpur highway junction and at ch 93.835 on pacific junction on pindwara udaipur section of nh 27 in the state of rajasthan on epc mode
Read moreConstruction of 1 flyover at palbani,1 pup at kuchai,1 pup at samsanghat on jharpokharia balasore section of nh 18 and 1 vup at manda on baharagora singhara of nh 49 in the state of odisha on epc mode
Construction of 1 flyover at palbani,1 pup at kuchai,1 pup at samsanghat on jharpokharia balasore section of nh 18 and 1 vup at manda on baharagora singhara of nh 49 in the state of odisha on epc mode
Read moreConstruction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Construction of bypass road to aska town on nh-157 in the state of odisha on epc mode
Read moreConstruction of the flyover at dedwa village at km 276.110 and kurja phanta junction at km 162.332 on barmer gandhav gujarat border section of nh 68 in the state of rajasthan on epc mode
Construction of the flyover at dedwa village at km 276.110 and kurja phanta junction at km 162.332 on barmer gandhav gujarat border section of nh 68 in the state of rajasthan on epc mode
Read moreof your Industry type