Tender Details
Particulars | Details |
---|---|
Title |
Electrification Work 250 Watt Led Flood Light For 10 And 12 Under Madhya Vidhansabha Bhopal.
|
Description |
Electrification Work 250 Watt Led Flood Light For 10 And 12 Under Madhya Vidhansabha Bhopal.
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2025_UAD_423266_1 |
Reference Number |
2020162192 |
Tender Fee | 2295 |
EMD | 4681 |
Tender Value | |
Place | ISBT Parisar, Verma Travels Office 1st Flore |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=498739 |
Start Date | May 14, 2025 23:00 |
End Date |
28/05/2025 ( Expired 13 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreWork of complete erection of 01 no. a type tower between location no. 60 and 61 for reduce sagging of existing towers of 132 kv mahoba-panwari-i line under etd hamirpur.
Work of complete erection of 01 no. a type tower between location no. 60 and 61 for reduce sagging of existing towers of 132 kv mahoba-panwari-i line under etd hamirpur.
Read moreProviding gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Providing gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Read moreTerm contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Term contract for artificer work in omq, single officers accn , officer mess and servant qtr in the area of age b/r - i under ge (af) lohegaon
Read moreReplacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read moreEng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Eng. pro. const. and comm. epc and performance followed by o and m of stp of 40 mld capacity based on sequential batch reactor sbr technology near chandlai lake for bambala area, sanganer sewerage work under ee phe i jda jaipur
Read moreof your Industry type