Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Procurement Notice: Coal Mine Cleaning Services 🏛️ Eastern Coalfields Limited (Ecil), A Public Sector Undertaking, Is Seeking Bids From Experienced Service Providers For The Cleaning Of The 2 Ed Belt From 2 L To 16 L Of The Rviii B1 Seam At Shyamsundarpur Colliery. 🤝 📅 Bid Submission Deadline: May 31, 2024, 2:00 Pm Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 2700. Tender Documents Can Be Obtained From The Official Procurement Portal Of Ecil. Proposals Should Detail The Methodology, Equipment, Manpower, And Timelines For The Completion Of The Cleaning Services, Ensuring Compliance With Safety And Environmental Regulations. Keywords: Cleaning Services, Coal Mine, Eastern Coalfields Limited, Public Sector Undertaking, Tender, Bid, Shyamsundarpur Colliery, Rviii B1 Seam, Procurement Notice| Particulars | Details |
|---|---|
| Title |
Cleaning Along 2 Ed Belt From 2 L To 16 L Of Rviii B1 Seam At Shyamsundarpur Colliery.
|
| Description |
Cleaning Along 2 Ed Belt From 2 L To 16 L Of Rviii B1 Seam At Shyamsundarpur Colliery.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_308637_1 |
|
Reference Number |
ECL/GM/BA/E TENDER/24-25/Min/17 Dt 20.05.2024 |
| Tender Fee | 0 |
| EMD | 2700 |
| Tender Value | - |
| Place | shyamsundarpur colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=319804 |
| Start Date | May 21, 2024 19:30 |
| End Date |
Expired
31/05/2024
Expired 869 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cleaning along 19l belt from 7wd to 19wd in rvii a seam at shyamsundarpur colliery.
Cleaning along 19l belt from 7wd to 19wd in rvii a seam at shyamsundarpur colliery.
Read moreConstruction of underground drain along rviiit2, r viiib1 and r vii seam with main incline and construction of three nos. of guard wall at shyamsundarpur colliery.
Construction of underground drain along rviiit2, r viiib1 and r vii seam with main incline and construction of three nos. of guard wall at shyamsundarpur colliery.
Read moreEstablishment of track lines for transporting of materials at inter mediate sum area in rvii seam at shyamsundarpur colliery.
Establishment of track lines for transporting of materials at inter mediate sum area in rvii seam at shyamsundarpur colliery.
Read moreInstallation of belt conveyors for k13 panel of lhcm in rv seam of khottadih colliery, pandaveswar area
Installation of belt conveyors for k13 panel of lhcm in rv seam of khottadih colliery, pandaveswar area
Read moreInstallation and commissioning of 4sets of centrifugal pump set with all electricals, water pipe range in rvii and rviia seam of shyamsundarpur colliery under bankola area.
Installation and commissioning of 4sets of centrifugal pump set with all electricals, water pipe range in rvii and rviia seam of shyamsundarpur colliery under bankola area.
Read moreRepairing of 3.3kv, 500kw, 1492rpm,sl.no.3ff330666-1 marathon make squirrel cage induction motor of steel chord belt at shyamsundarpur colliery under bankola area.
Repairing of 3.3kv, 500kw, 1492rpm,sl.no.3ff330666-1 marathon make squirrel cage induction motor of steel chord belt at shyamsundarpur colliery under bankola area.
Read moreRepairing of a)2 nos. of 600x1400mm drum, b) 400x1400mm, c) making rings of 3 nos. of sbds3160 bearing block of steel chord belt at shyamsundarpur colliery under bankola area.
Repairing of a)2 nos. of 600x1400mm drum, b) 400x1400mm c) making rings of 3 nos. of sbds3160 bearing block of steel chord belt at shyamsundarpur colliery under bankola area.
Read moreRectification of gear coupling and rectification of loop-take-up unit and changing old vcb, starter of 4d belt in rvi seam of mic, jhanjra project colliery.
Rectification of gear coupling and rectification of loop-take-up unit and changing old vcb, starter of 4d belt in rvi seam of mic, jhanjra project colliery.
Read moreProposal for cleaning slurry debris along 48d plus 1 l to 47d plus 1 l in r v seam at mic unit of jhanjra project colliery
Proposal for cleaning slurry debris along 48d plus 1 l to 47d plus 1 l in r v seam at mic unit of jhanjra project colliery
Read moreRepairing of five no pressure drum shell dia 215 mm x 1150 mm long shaft dia 75 mm of 1000 mm belt conveyors rvii and rviia seam installed in 3 and 4 incline j p colliery
Repairing of five no pressure drum shell dia 215 mm x 1150 mm long shaft dia 75 mm of 1000 mm belt conveyors rvii and rviia seam installed in 3 and 4 incline j p colliery
Read moreof your Industry type