Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Damrikaran Of Bagsari Dungalgoan Motor Road In Gangotri Assembly Constituency Of District Uttarkashi Under State Sector
|
| Description |
Damrikaran Of Bagsari Dungalgoan Motor Road In Gangotri Assembly Constituency Of District Uttarkashi Under State Sector
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_pwd_76565_1 |
|
Reference Number |
1947/7a/nivida |
| Tender Fee | 4720 |
| EMD | 2.7 Lakh |
| Tender Value | - |
| Place | uttarkashi |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=91370 |
| Start Date | October 09, 2024 15:30 |
| End Date |
Expired
18/10/2024
Expired 725 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Protection work in harshil -mukhwa motor road of gangotri constituency in district uttarkashi block bhatwari under sdmf
Protection work in harshil -mukhwa motor road of gangotri constituency in district uttarkashi block bhatwari under sdmf
Read moreStrengthening and improvement of remaing part of jatta paletha khansi motor road under state sector in block naugaon, purola assembly constituency in distric uttarkashi.(chainage 3.00 to 8.00 km total 5.00 km)
Strengthening and improvement of remaing part of jatta paletha khansi motor road under state sector in block naugaon, purola assembly constituency in distric uttarkashi.(chainage 3.00 to 8.00 km total 5.00 km)
Read moreConsultancy services for preparation of dpr for rehabilitation and upgradation of existing road between km 0.00 to km 86.00 gangotri to heena from existing/single lane to double lane with paved shoulder specification on gangotri-uttarkashi-dharasu.
Rehabilitation and upgradation of existing road between km 0.00 to km 86.00 gangotri to heena from existing/single lane to double lane with paved shoulder specification on gangotri uttarkashi-dharasu road nh34 in the state of uttarakhand length 86 km
Read moreImprovement and damrikaran work of muwani gobrari motor road km. 2.00 to chitgalgaon motor road under scsp (length 3.00 km)
Improvement and damrikaran work of muwani gobrari motor road km. 2.00 to chitgalgaon motor road under scsp (length 3.00 km)
Read moreMotor gland and shaft sealing assembly,stator copper winding assembly - 410 kw, 3.3 kv ht motor,rear-side bearing assembly - 410 kw, 3.3 kv ht motor,front-side bearing assembly - 410 kw, 3.3 kv ht motor,motor coupling and flexible element assembly
Motor gland and shaft sealing assembly,stator copper winding assembly - 410 kw, 3.3 kv ht motor,rear-side bearing assembly - 410 kw, 3.3 kv ht motor,front-side bearing assembly - 410 kw, 3.3 kv ht motor,motor coupling and flexible element assembly
Read moreInstallation of led lights at various locations in ganderbal assembly constituency
Installation of led lights at various locations in ganderbal assembly constituency
Read moreAir conditioner assembly mpn g6051,hydaulic motor mpn v5102
Air conditioner assembly mpn g6051,hydaulic motor mpn v5102
Read moreDriver assembly ( training drive motor, traverse/ elevation driver),motor and brake assembly,laser range finder sys,emu top assy ( mfg- eqpt config, emu)
Driver assembly ( training drive motor, traverse/ elevation driver),motor and brake assembly,laser range finder sys,emu top assy ( mfg- eqpt config, emu)
Read moreUnder the state plan, extension of dooni sukunda motor road of kapkot assembly constituency of bageshwar till shobhakund, under 8 km motor road, new construction work of 6 to 8 km (total length 3 km) motor road (second phase stage-i) .
Under the state plan, extension of dooni sukunda motor road of kapkot assembly constituency of bageshwar till shobhakund, under 8 km motor road, new construction work of 6 to 8 km (total length 3 km) motor road (second phase stage-i)
Read moreof your Industry type