Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Soil Erosion And Scour Protection Gabion Wall From Udhalshe Bandhara To Bridge In Dharbandora Taluka
|
| Description |
Soil Erosion And Scour Protection Gabion Wall From Udhalshe Bandhara To Bridge In Dharbandora Taluka
|
| Organisation | WATER RESOURCE DEPARTMENT | State Govt. and UT |
| Tender Id | 2024_WRD_14878_1 |
|
Reference Number |
WRD/Mhadeicell/f37-1/13/23-24 |
| Tender Fee | 21000 |
| EMD | 7.42 Lakh |
| Tender Value | - |
| Place | Margao |
| Link |
View Original Tender Notice
https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=15157 |
| Start Date | March 07, 2024 18:00 |
| End Date |
Expired
20/03/2024
Expired 942 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of gabion wall for a length of 25 mtr to protect soil erosion along the nallah edge near shri. subash house at kamlapur under sd-iii, nacd, apwd, mayabunder.
Construction of gabion wall for a length of 25 mtr to protect soil erosion along the nallah edge near shri. subash house at kamlapur under sd-iii, nacd, apwd, mayabunder.
Read moreSlope stabilisation and soil protection works at km 34.05 (teitrung bridge), km 27.900 (shonsho bridge), km 33.250 (mayung bridge) and km 84.575 (mokaha bridge) on road tuensang-mon under 100 rcc/ 15brtf (p) sewak in nagaland state under epc mode
Slope stabilisation and soil protection works at km 34.05 (teitrung bridge), km 27.900 (shonsho bridge), km 33.250 (mayung bridge) and km 84.575 (mokaha bridge) on road tuensang-mon under 100 rcc/ 15brtf (p) sewak in nagaland state under epc mode
Read moreProviding parapet wall for protection of muck of spoil bank from erosion in ghanauli section.
Providing parapet wall for protection of muck of spoil bank from erosion in ghanauli section.
Read moreStabilization to the unstable hill slope to prevent soil erosion near shree paikdev temple at digas panchawadi in shiroda constituency.
Stabilization to the unstable hill slope to prevent soil erosion near shree paikdev temple at digas panchawadi in shiroda constituency.
Read moreSupply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Read moreStabilization to the unstable hill slope for the hill to protect soil erosion at talwate tallyewada in village betoda of shiroda constituency.
Stabilization to the unstable hill slope for the hill to protect soil erosion at talwate tallyewada in village betoda of shiroda constituency.
Read moreSupply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Read moreConstruction of chutes/drains at various locations along the green belt developed between arail and bandha road in naini, to prevent soil erosion caused by rainfall.
Construction of chutes/drains at various locations along the green belt developed between arail and bandha road in naini, to prevent soil erosion caused by rainfall.
Read moreFlood protection work for protection of village mohammadpur bhudia, from erosion caused by the devha river located in khatima block of udham singh nagar district. reach- km 0.400 to 1.200 km.
Flood protection work for protection of village mohammadpur bhudia, from erosion caused by the devha river located in khatima block of udham singh nagar district. reach- km 0.400 to 1.200 km.
Read moreContretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran
Contretaining wall cumbuilt rectangular spillway(2)50mtr, river bank pt wall cum check dam(6)50mtr, retaining wall cum curved spillway(3)50mtr,step gabion river bank protection wall(3)50mtr,cc spilway/drop structure(3)step gabion spur(12) 30mtr baran
Read moreof your Industry type