Tender Details

About Tender

🚂 Procurement Opportunity: Maintenance Team For Access Network 🛠️ The Rail Tel Corporation Of India Ltd, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids For The Deployment Of A Maintenance Team For Privileged Maintenance And Fault Rectification Of Access Network, Including Underground (U/G) And Aerial Optical Fiber Cable (Ofc) Systems, For A Duration Of Two Years. 📅 Bid Submission Deadline: April 12, 2024, 3:00 Pm A Tender Security Amount Of Inr 116,000/ Is Required With The Earnest Money Deposit (Emd). Interested Bidders Should Review The Tender Document For Detailed Requirements And Submit Their Proposals Accordingly. Keywords: Maintenance Team, Access Network, Rail Tel Corporation Of India Ltd, Central Government, Ofc Maintenance, Privileged Maintenance, Fault Rectification, Tender Opportunity
Particulars Details
Title
Deployment Of Maintenance Team For Prive Maintenance And Fault Rectification Of Access Network I.E. U/G And Aerial Ofc For A Period Of Two Years
Description
Deployment Of Maintenance Team For Prive Maintenance And Fault Rectification Of Access Network I.E. U/G And Aerial Ofc For A Period Of Two Years
Organisation Rail Tel Corporation of India Ltd | Central Govt. Ministry/Department
Tender Id 2024_RTCIL_751336_1
Reference
Number
RailTel/e-Tender/OT/ SR/ SC/2023-24/59
Tender Fee 0
EMD 1.16 Lakh
Tender Value
Place As per Tender Document
Link https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1054610
Start Date March 22, 2024 16:45
End Date

12/04/2024 ( Expired 428 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Read more
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis

Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis

Read more
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Deployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years

Deployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise