Tender Details
Particulars | Details |
---|---|
Title |
Nctps Ii Unit I Ii Time Bound Works In Various Operation Locations Of Switch Gear Panel At 3 5 Mtr 12 5 Mtr At Switch Gear Control Room Boiler 31 5 Mtr Switch Gear Panel And Recording Of Parameters From Dcs At Unit Control Room Of Unit I Ii For
|
Description |
Nctps Ii Unit I Ii Time Bound Works In Various Operation Locations Of Switch Gear Panel At 3 5 Mtr 12 5 Mtr At Switch Gear Control Room Boiler 31 5 Mtr Switch Gear Panel And Recording Of Parameters From Dcs At Unit Control Room Of Unit I Ii For
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_518119_1 |
Reference Number |
CE/NCTPS-II/SE/O/11/2024-2025 |
Tender Fee | 0 |
EMD | 2800 |
Tender Value | |
Place | SE |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=616566 |
Start Date | January 10, 2025 23:00 |
End Date |
27/01/2025 ( Expired 84 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Annual work contract for providing assistance in collection, preparation and transportation of various coal samples of ph-i (unit 1 and unit 2) and ph-ii (unit 3 and unit 4) at sstpp, mppgcl, dongalia, khandwa for a period of 12 months
Annual work contract for providing assistance in collection, preparation and transportation of various coal samples of ph-i (unit 1 and unit 2) and ph-ii (unit 3 and unit 4) at sstpp, mppgcl, dongalia, khandwa for a period of 12 months
Read moreConstruction of 5 nos watch towers at various locations with 1 no guard hut near solar control room at 765 kv gss phagi rrvpnl jaipur
Construction of 5 nos watch towers at various locations with 1 no guard hut near solar control room at 765 kv gss phagi rrvpnl jaipur
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Read moreSitc of 12 mtr high mast with 6 nos. of 200w led flood lights at 3 various locations and sitc of 9 mtr mini mast with 6 nos. of 150w led flood lights at 7 various locations in thenkara gp, agali gp, mannarkkad lac under mla-ads of sri. n.samsudheen
Sitc of 12 mtr high mast with 6 nos. of 200w led flood&#x0d lights at 3 various locations and sitc of 9 mtr mini mast&#x0d with 6 nos. of 150w led flood lights at 7 various locations&#x0d in thenkara gp, agali gp, mannarkkad lac
Read moreRepair maintenance and improvement of lt panel including lt switch gear, overheadline, pole box and allied works at various locations in area of age e/m (hosp) under ge e/m lucknow.
Repair maintenance and improvement of lt panel including lt switch gear, overheadline, pole box and allied works at various locations in area of age e/m (hosp) under ge e/m lucknow.
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreSp.113 nctps ii es circle mrt division unit i generator turbine and boiler areas and their auxiliaries time bound contract works for the routine maintenance of mrt equipment for a period of 360 days upto 31 03 2026 from the date of taking over th
Sp.113 nctps ii es circle mrt division unit i generator turbine and boiler areas and their auxiliaries time bound contract works for the routine maintenance of mrt equipment for a period of 360 days upto 31 03 2026 from the date of taking over th
Read moreSp.114 nctps ii es circle mrt division unit ii rectification of gear mechanism failure in actuators at turbine and boiler area of unit ii under rate contract basis for a period of 360 days from 01 04 2025 under open tender system upto 31 03 202
Sp.114 nctps ii es circle mrt division unit ii rectification of gear mechanism failure in actuators at turbine and boiler area of unit ii under rate contract basis for a period of 360 days from 01 04 2025 under open tender system upto 31 03 202
Read moreSp.109 nctps-ii es circle mrt division unit ii generator turbine and boiler areas and their auxiliaries time bound contract works for the routine maintenance of mrt equipment for a period of 360 days upto 31 03 2026 from the date of taking over
Sp.109 nctps-ii es circle mrt division unit ii generator turbine and boiler areas and their auxiliaries time bound contract works for the routine maintenance of mrt equipment for a period of 360 days upto 31 03 2026 from the date of taking over
Read moreSurvey design fabrication supply installation testing commissioning and operation and maintenance for a period of 5 years of 216 nos of 9 mtr solar led high mast at various locations in nagpur district in the state of maharashtra
Survey design fabrication supply installation testing commissioning and operation and maintenance for a period of 5 years of 216 nos of 9 mtr solar led high mast at various locations in nagpur district in the state of maharashtra
Read moreof your Industry type