Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing And Rewinding Of 250 Kva, 3.3 Kv 440 V Siemens Make Transformer Sl No 722358 (Break Down) Installed At Kb 5/6 Pit Power Sub Station.
|
| Description |
Repairing And Rewinding Of 250 Kva, 3.3 Kv 440 V Siemens Make Transformer Sl No 722358 (Break Down) Installed At Kb 5/6 Pit Power Sub Station.
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_328000_1 |
|
Reference Number |
BCCL/PBA/AM(EnM)/2024-25/91 dated-06.02.2025 |
| Tender Fee | 0 |
| EMD | 1300 |
| Tender Value | - |
| Place | KB 5/6 PIT COLLIERY |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340118 |
| Start Date | February 06, 2025 23:30 |
| End Date |
Expired
17/02/2025
Expired 608 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing and rewinding of 02 nos. of distribution transformers, 250kva, 11kv/440v and 250kva, 3.3kv/440v installed at cisf colony and gurudwara chowk under gm unit nk area.
Repairing and rewinding of 02 nos. of distribution transformers, 250kva, 11kv/440v and 250kva, 3.3kv/440v installed at cisf colony and gurudwara chowk under gm unit nk area.
Read moreRepairing, rewinding and installation of k-sambhav make, 11kv-3.3kv, 2mva transformer installed at chp substation at shyamsundarpur colliery under bankola area.
Repairing, rewinding and installation of k-sambhav make, 11kv-3.3kv, 2mva transformer installed at chp substation at shyamsundarpur colliery under bankola area.
Read moreComplete repairing or rewinding of power transformer 500kva 11kv, 440v sl. no. jwtp,dam site,01 installed at dam site jwtp under block ii area.
Complete repairing or rewinding of power transformer 500kva 11kv, 440v sl. no. jwtp,dam site,01 installed at dam site jwtp under block ii area.
Read moreComplete repairing and re-winding of (a) 02-nos. 500 kva, 3.3kv/440v (b) 01-no. 250kva, 3.3kv/440v and (c) 01-no. 160 kva, 11 kv/440 distribution transformers installed at different locations of kathara colliery under kathara area.
Complete repairing and re-winding of (a) 02-nos. 500 kva, 3.3kv/440v (b) 01-no. 250kva, 3.3kv/440v and (c) 01-no. 160 kva, 11 kv/440 distribution transformers installed at different locations of kathara colliery under kathara area.
Read moreComplete rewinding and repairing of primary and secondary breaker of andrew yule make 315 kva 3.3kv-550v sl no sspay03 transwitch transformer at shyamsundarpur colliery
Complete rewinding and repairing of primary and secondary breaker of andrew yule make 315 kva 3.3kv-550v sl no sspay03 transwitch transformer at shyamsundarpur colliery
Read moreSupply, erection, testing and commission [supply, erection, testing and commissioning of 250 kva outdoor type 11 kv/0.416 kv step-down distribution transformer.
Supply, erection, testing and commission [supply, erection, testing and commissioning of 250 kva outdoor type 11 kv/0.416 kv step-down distribution transformer.
Read moreSpares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard
Spares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard
Read moreRewinding and repair of 63 kva transformer installed at ips-3 (rajiv colony) and replacement of mccb at ips-2 (rajiv colony),jammu contract no sdj/w/101/2026-27
Rewinding and repair of 63 kva transformer installed at ips-3 (rajiv colony) and replacement of mccb at ips-2 (rajiv colony),jammu contract no sdj/w/101/2026-27
Read moreTaking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span
Taking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreof your Industry type