Tender Details
Particulars | Details |
---|---|
Title |
(1)current To Pressure Measurement Trainer (2)torque Measurement Trainer (3)vibration Measurement Trainer (4)measurement Of Power By Two Wattmeter Kit
|
Description |
As Per Tender Documents
|
Organisation | Maulana Azad National Institute of Technology | Central Govt. Ministry/Department |
Tender Id | 2024_MANIT_746206_1 |
Reference Number |
MANIT/EE/2023-24/62 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Department of Electrical Engineering |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1049391 |
Start Date | February 16, 2024 21:30 |
End Date |
26/02/2024 ( Expired 471 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreSpecial repair to asbestos sheet and connected br works to bldg nos. p 2 p 3 and p 4 and provn of parking sheds at various locations at mil stn gandhinagar
Special repair to asbestos sheet and connected br works to bldg nos. p 2 p 3 and p 4 and provn of parking sheds at various locations at mil stn gandhinagar
Read moreUpgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Upgradation of muktsar-abohar road via panniwala (mktodr-32) rd 0.00-19.20, 28.00-37.70 equal to 28.90 km including maintenance of road for 3 year (1 year defect liability period plus 2 year maintenance period)
Read moreRenovation of sanitary items electrical wiring and other miscellaneous civil works of washrooms at power house no 1 2 and 3 of ubdc project malikpur pathankot
Renovation of sanitary items electrical wiring and other miscellaneous civil works of washrooms at power house no 1 2 and 3 of ubdc project malikpur pathankot
Read moreGeneral fund -construction of new cc drains and culvert from d.no.89/2-2-15-1-1 to d.no.89/2-2-15-2-1 d.no.89/2-2-11-4-1 to 89/2-2-11-7-a stantanpuram in ward no.39.
Construction of new cc drains and culvert from d.no.89/2-2-15-1-1 to d.no.89/2-2-15-2-1 d.no.89/2-2-11-4-1 to 89/2-2-11-7-a stantanpuram in ward no.39.
Read moreof your Industry type