Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Work Of M.S. Road Nh 552 Sabalgarh To Jhundpura Nagar Panchayat Two Lane Road Length 20.70 Km. I/C Pole Shifting
|
| Description |
Construction Work Of M.S. Road Nh 552 Sabalgarh To Jhundpura Nagar Panchayat Two Lane Road Length 20.70 Km. I/C Pole Shifting
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_292057_1 |
|
Reference Number |
14/2023-24/Morena/02 |
| Tender Fee | 50000 |
| EMD | 12.22 Lakh |
| Tender Value | - |
| Place | O/o C.E. (North Zone) P.W.D. Gwalior |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | July 18, 2023 23:00 |
| End Date |
Expired
04/08/2023
Expired 1167 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction work of badagaon to sihoniya road two lane road length-15.50 km. (including pole shifting)
Construction work of badagaon to sihoniya road two lane road length-15.50 km. (including pole shifting)
Read moreConstruction work of nagra to surjanpur mirghan to barahet road two lane road length-27.70 k.m (including pole shifting)
Construction work of nagra to surjanpur mirghan to barahet road two lane road length-27.70 k.m (including pole shifting)
Read moreConstruction work of dimani nahar road n.h. 44 sikroda to jakhona devhansh ruar ki puliya to lane road length 46.00 km. (including pole shifting)
Construction work of dimani nahar road n.h. 44 sikroda to jakhona devhansh ruar ki puliya to lane road length 46.00 km. (including pole shifting)
Read moreConstruction of gram bokdiya to gujrat border road length 05.80km. i/c electric pole shifting work.
Construction of gram bokdiya to gujrat border road length 05.80km. i/c electric pole shifting work.
Read moreConstruction upgradation of village dhaturia to mahi bridge to labriya road length 17.63km. i/c electric pole shifting work.
Construction upgradation of village dhaturia to mahi bridge to labriya road length 17.63km. i/c electric pole shifting work.
Read moreConsultancy services for preparation of detailed project report for 4 lane access controlled development of existing 4-lane from solapur to sangareddy section of nh-65 (length 246km).
Consultancy services for preparation of detailed project report for 4 lane access controlled development of existing 4-lane from solapur to sangareddy section of nh-65 (length 246km).
Read moreBalance work for shifting of utilities water pipe line possessed by adda for the work construction of 4 lane raniganj bypass of length 5.261 km on nh 60 new nh14 from km 275.20 of nh 60 to km 418.18 of nh2 new nh19 in paschim bardhaman,west bengal .
Balance work for shifting of utilities water pipe line possessed by adda for the work construction of 4 lane raniganj bypass of length 5.261 km on nh 60 new nh14 from km 275.20 of nh 60 to km 418.18 of nh2 new nh19 in paschim bardhaman,west bengal .
Read moreConstruction of upgradation and widening of kalapipal khamlay amlay road total length 29.00 km in including electric pole shifting work under pwd din s shajapur
Construction of upgradation and widening of kalapipal khamlay amlay road total length 29.00 km in including electric pole shifting work under pwd din s shajapur
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Read moreSpecial repair works of indore dhar ahmedabad 4-lane section of nh-47(59) from km 5.00 to 9.50 (length 4.50 km) in the state of madhya pradesh
Special repair works of indore dhar ahmedabad 4-lane section of nh-47(59) from km 5.00 to 9.50 (length 4.50 km) in the state of madhya pradesh
Read moreof your Industry type