Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 01 No. Storage Tank, 08 No. Anchor Blocks, 100 No. Thrust Blocks, Steel Rope Crossing, Protection Work And Laying Fitting Of Gi/Hdpe Pipes In Gravity Main, Sub Main And Distribution Systems Of Water Supply Scheme Koti Basti Under Jjm
|
| Description |
Construction Of 01 No. Storage Tank, 08 No. Anchor Blocks, 100 No. Thrust Blocks, Steel Rope Crossing, Protection Work And Laying Fitting Of Gi/Hdpe Pipes In Gravity Main, Sub Main And Distribution Systems Of Water Supply Scheme Koti Basti Under Jjm
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2024_PHE_261610_2 |
|
Reference Number |
e_NIT No. 15 Of 10/2024-25 |
| Tender Fee | 1000 |
| EMD | 60720 |
| Tender Value | - |
| Place | Basti |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=787443 |
| Start Date | October 22, 2024 21:30 |
| End Date |
Expired
29/10/2024
Expired 715 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Winter route markers with technical specification as per appx a of ts,pcc cement 43 grade in hdpe bag of 50 kg each conf to is 269 to 1976,coarse sand,40mm stone aggregates,quick setting compound,50mm nominal bore gi pipe 3 mtr long 3 point 65mm thick wt 5 point 10 mtr per rm,50mm gi socket nominal bore gi pipe 100mm long internal and external thread thick 3 point 65mm,ms plate 6mm thick size 150mm into 150mm with 4 hole 10mm dia for u clip,250mm long flat iron stiffeners size 25mm into 3mm,8mm dia u shape rod as per drawing,pp rope 12mm dia specified colour,flurescent tape 3 inch thick size 25 mtr long red yellow and white,anti corrosive primer paint,enamel paint og colour,th,2 feet roller brush,open jaw double ended spanner size 10 into 12mm,2 inch pvc water levelling pipe 100 mtr long,masson trowel 150mm,5 kg hammer,brick line,gurmala 200mm wide and 600mm long,plumb bob,iron bucket 10 ltr capacity,iron tasala pan mortor,kassies,showel
Winter route markers with technical specification as per appx a of ts,pcc cement 43 grade in hdpe bag of 50 kg each conf to is 269 to 1976,coarse sand,40mm stone aggregates,quick setting compound,50mm nominal bore gi pipe 3 mtr long 3 point 65mm thick wt 5 point 10 mtr per rm,50mm gi socket nominal bore gi pipe 100mm long internal and external thread thick 3 point 65mm,ms plate 6mm thick size 150mm into 150mm with 4 hole 10mm dia for u clip,250mm long flat iron stiffeners size 25mm into 3mm,8mm dia u shape rod as per drawing,pp rope 12mm dia specified colour,flurescent tape 3 inch thick size 25 mtr long red yellow and white,anti corrosive primer paint,enamel paint og colour,th,2 feet roller brush,open jaw double ended spanner size 10 into 12mm,2 inch pvc water levelling pipe 100 mtr long,masson trowel 150mm,5 kg hammer,brick line,gurmala 200mm wide and 600mm long,plumb bob,iron bucket 10 ltr capacity,iron tasala pan mortor,kassies,showel
Read moreLaying and fitting of gravity main, rising main, commissioning of 01 no 5000 gph slow sand filtration plant at sundrani, 40 nos anchor blocks and 04 nos steel rope crossing under wss sundrani (jjm) (jjm)
Laying and fitting of gravity main, rising main, commissioning of 01 no 5000 gph slow sand filtration plant at sundrani, 40 nos anchor blocks and 04 nos steel rope crossing under wss sundrani (jjm) (jjm)
Read moreConstruction of thrust/anchor blocks for rising main of lis jalsheeri and stage 2nd of lis janbazpora.
Construction of thrust/anchor blocks for rising main of lis jalsheeri and stage 2nd of lis janbazpora.
Read moreConstruction of anchor /thrust blocks, protection work/ path for wss junk of pipes under (jkidfc) (part-2nd).
Construction of anchor /thrust blocks, protection work/ path for wss junk of pipes under (jkidfc) (part-2nd).
Read moreOfc 48core,hdpe pipe plb with rope,flexible conduit,gi pipe,0.6 mm warning tape,coupler for hdpe co
Read more
Ofc 48core,hdpe pipe plb with rope,flexible conduit,gi pipe,0.6 mm warning tape,coupler for hdpe co
Read more
Providing laying and fitting of hdpe gi pipes construction of chain link fencing construction of anchor saddle blocks for raw water main for wss gobarpora kashipora under nabard
Providing laying and fitting of hdpe gi pipes construction of chain link fencing construction of anchor saddle blocks for raw water main for wss gobarpora kashipora under nabard
Read moreProviding laying and fitting of hdpe gi pipes construction of chain link fencing construction of anchor/ saddle blocks for raw water main for wss gobarpora kashipora under nabard
Providing laying and fitting of hdpe gi pipes construction of chain link fencing construction of anchor/ saddle blocks for raw water main for wss gobarpora kashipora under nabard
Read moreBalance work of re-construction of anchor /thrust blocks of manifold stage-ii pump hose of tral lift irrigation scheme.
Balance work of re-construction of anchor /thrust blocks of manifold stage-ii pump hose of tral lift irrigation scheme.
Read moreof your Industry type