Tender Details

Particulars Details
Title
Specification For Procurement Of Mechanical Seal Assembly And Bowl Hub Spares For Hp 803 Bowl Mills In Unit Iv And V
Description
Specification For Procurement Of Mechanical Seal Assembly And Bowl Hub Spares For Hp 803 Bowl Mills In Unit Iv And V
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_535672_1
Reference
Number
CE/TTPS/3773-S
Tender Fee 0
EMD 9400
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=637568
Start Date March 26, 2025 19:30
End Date

16/04/2025 ( Expired 80 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Read more
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Read more
Pre-dispatch inspection, supply, installation, testing, commissioning, training and warranty of plc based in cell equipment for production of iodine 131 and spares as per the attached specification

Pre-dispatch inspection, supply, installation, testing, commissioning, training and warranty of plc based in cell equipment for production of iodine 131 and spares as per the attached specification

Read more
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.

Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.

Read more
Procurement of spares of esp hopper fluidizing pad and plenum plate for ash intake valve installed in ash handling system of unit no. 10 and 11 of stps, sarni.

Procurement of spares of esp hopper fluidizing pad and plenum plate for ash intake valve installed in ash handling system of unit no. 10 and 11 of stps, sarni.

Read more
Supply and delivery of spares for abb make 11kv indoor vcbs type vd4 hca 12 installed in stage i power house jhp po and ps jaldhaka dist kalimpong west bengal 734503

Supply and delivery of spares for abb make 11kv indoor vcbs type vd4 hca 12 installed in stage i power house jhp po and ps jaldhaka dist kalimpong west bengal 734503

Read more
World bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply works (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, ai based cwims and cmms and 7 years of om for entire water supply (except intake to wtp) on dbo basis in amaravati

Survey, investigation, design, construction of balance works, testing, commissioning of water supply works (clear water pump house (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, a.i based centralized water information management system (cwims) computerized maintenance management system (cmms) and 7 years om for entire water supply (except intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiv)

Read more
Procurement of spares for bottom ash system system of unit#3 for the upcoming oh in 2026 under ahp (mm) dept., ktps

Procurement of spares for bottom ash system system of unit#3 for the upcoming oh in 2026 under ahp (mm) dept., ktps

Read more
Specification for procurement of journal head assembly in complete for hp 803 bowl mills

Specification for procurement of journal head assembly in complete for hp 803 bowl mills

Read more
Procurement of bowl hub for hp 803 bowl mills

Procurement of bowl hub for hp 803 bowl mills

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise