Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renovation And Modernization Of Sadha Disty. And Its System (Package Smgs C)
|
| Description |
Renovation And Modernization Of Sadha Disty. And Its System (Package Smgs C)
|
| Organisation | IGNP | State Govt. and UT |
| Tender Id | 2024_IGNP_439201_2 |
|
Reference Number |
ACE/JSM/NIB4/2024-25 |
| Tender Fee | 12500 |
| EMD | 92.36 Lakh |
| Tender Value | |
| Place | As per Bid |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=789018 |
| Start Date | December 21, 2024 14:30 |
| End Date |
Expired
20/01/2025
Expired 528 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation and modernization of critical infrastructure work at hydro power training centre nangal punjab.
Upgradation and modernization of critical infrastructure work at hydro power training centre nangal punjab.
Read moreLeftover work for provn of ground exploitation system of aew and c at af stn borjhar
Leftover work for provn of ground exploitation system of aew and c at af stn borjhar
Read moreRenovation of supply air-conditioning system of k-4 and k5 with other accessories for rlg, barc, mumbai
Renovation of supply air-conditioning system of k-4 and k5 with other accessories for rlg, barc, mumbai
Read moreConstruction and maintenance of industrial safety and security etc at bodhjungnagar industrial estate tripura package 18
Construction and maintenance of industrial safety and security etc at bodhjungnagar industrial estate tripura package 18
Read moreSupply and installation of femtosecond laser system.
Supply and installation of femtosecond laser system.
Read moreA)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line of sarubera colliery .
A)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line at sarubera colliery.
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreRenovation and redevelopment of chawani sadan in ward no.04
Renovation and redevelopment of chawani sadan in ward no.04
Read moreSupply installation testing commissioning of multi modal imaging system
Multi modal imaging system with confocal and flim capability
Read moreRepair and renovation of assistant executive engineer residence at sub division marwah
Repair and renovation of assistant executive engineer residence at sub division marwah
Read moreof your Industry type