Tender Details

Particulars Details
Title
S. S. Plate To Sa 240 Tp 321 Of Asme Sec Ii, Part A; 2023 In Size: 1 Mm Tk X 1250 Mm W X 2900 Mm
Description
Organisation Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises
Tender Id GEM/2025/B/6034570
Reference
Number
Tender Fee
EMD
Tender Value 2 Crore
Place
Link https://bidplus.gem.gov.in/all-bids
Start Date March 08, 2025 22:23
End Date

18/03/2025 ( Expired 33 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Prov,lay nd comp of readymade bituminous (hmp) mix for bm 50 mm tk layer, bc 30 mm tk layer, rd mark wd tp paint 2.5 mm tk for resurf wks on rd kulwanta-r-c peak bet km 0.000 to 10.600 in 69 rcc/35 brtf/p sampark jk 2nd call

Prov,lay nd comp of readymade bituminous (hmp) mix for bm 50 mm tk layer, bc 30 mm tk layer, rd mark wd tp paint 2.5 mm tk for resurf wks on rd kulwanta-r-c peak bet km 0.000 to 10.600 in 69 rcc/35 brtf/p sampark jk 2nd call

Read more
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augumentation in connection to accommodate fhtc at p.h. no.-i, ii, iii iv (new) under dakshin akhratala w/s scheme under bloc

Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augumentation in connection to accommodate fhtc at p.h. no.-i, ii, iii iv (new) under dakshin akhratala w/s scheme under bloc

Read more
(1) supply of smart rtu prototype systems for phase-i, qty: 3 no s and (2) supply of smart rtu production systems for phase-ii, qty: 3 no s. scope of work & technical details as mentioned in annexure t1 to ecil-hyderabad.

(1) supply of smart rtu prototype systems for phase-i, qty: 3 no s and (2) supply of smart rtu production systems for phase-ii, qty: 3 no s. scope of work & technical details as mentioned in annexure t1 to ecil-hyderabad.

Read more
Tender for supply of equipment / material , design, erection, testing commissioning for sop to jsv for sewerage treatment plant by prov. 11/.4 kv 100 kva s/stn. at gosan a/w 11 kv ht/lt line , in section bharmour-1 under esd bharmour ed chamba

Tender for supply of equipment / material , design, erection, testing commissioning for sop to jsv for sewerage treatment plant by prov. 11/.4 kv 100 kva s/stn. at gosan a/w 11 kv ht/lt line , in section bharmour-1 under esd bharmour ed chamba

Read more
Tender for supply of equipment / material , design, erection, testing commissioning for sop to jsv for lis kakdolu by prov. 11/.4 kv 100 kva s/stn. a/w 11 kv ht/lt line , in section maredi under esd chamba-ii ed chamba

Tender for supply of equipment / material , design, erection, testing commissioning for sop to jsv for lis kakdolu by prov. 11/.4 kv 100 kva s/stn. a/w 11 kv ht/lt line , in section maredi under esd chamba-ii ed chamba

Read more
Prov. and laying of 4 inch i/d di w/s pipe line to overcome the problem of low pressure from h.no.1285 to 1296/1 sec.30b chd under the charge of sde mcph 16 chd.

Prov. and laying of 4 inch i/d di w/s pipe line to overcome the problem of low pressure from h.no.1285 to 1296/1 sec.30b chd under the charge of sde mcph 16 chd.

Read more
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0

Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise