Tender Details
Particulars | Details |
---|---|
Title |
Supply Installation Testing And Commissioning Of Real Time Effluent Quality Monitoring System With Calibration Operation And Comprehensive Mtc For 3 Yrs After Guarantee Period Of 12 Months At 5 Mld Stp At Indl Area Ph 3 Near Raipur Kalan Ut Chd
|
Description |
Supply Installation Testing And Commissioning Of Real Time Effluent Quality Monitoring System With Calibration Operation And Comprehensive Mtc For 3 Yrs After Guarantee Period Of 12 Months At 5 Mld Stp At Indl Area Ph 3 Near Raipur Kalan Ut Chd
|
Organisation | Chandigarh Administration | State Govt. and UT |
Tender Id | 2024_CHD_80472_1 |
Reference Number |
PH8/2024/1587168/54 |
Tender Fee | 0 |
EMD | 1.12 Lakh |
Tender Value | |
Place | Chandigarh |
Link | https://etenders.chd.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=99154 |
Start Date | June 11, 2024 17:30 |
End Date |
08/07/2024 ( Expired 305 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Operation and maintenance of stp 3 mld capacity on sbr technology at moonak town distt. sangrur for the year 2025-26. period 01.04.2025 to 31.03.2026 i.e. 12 months
Operation and maintenance of stp 3 mld capacity on sbr technology at moonak town distt. sangrur for the year 2025-26. period 01.04.2025 to 31.03.2026 i.e. 12 months
Read moreSupplying , installing, testing, commissioning and 05 years operation and maintenance of online continuous effluent monitoring system (ocems) at the outlet of 87 mld stp bondhar, 30 mld stp elichpur, 15 mld stp sangavi and 10 mld stp dunkin respectiv
Supplying , installing, testing, commissioning and 05 years operation and maintenance of online continuous effluent monitoring system (ocems) at the outlet of 87 mld stp bondhar, 30 mld stp elichpur, 15 mld stp sangavi and 10 mld stp dunkin respectiv
Read moreSurvey, soil testing, design,supply and const,install. commissioning of 15.00 mld capacity stp cum 30.00 kld fstp at kharar. operation and maintenance for a period of 60 months after stabilization period of 3 months or more.
Survey, soil testing, design,supply and const,install. commissioning of 15.00 mld capacity stp cum 30.00 kld fstp at kharar. operation and maintenance for a period of 60 months after stabilization period of 3 months or more.&#x0d &#x0d
Read moreSupply installation testing commissioning of real time effluent quality monitoring system with calibration operation and comprehensive mtc for 3 yrs after guarantee period of 12 months at 5 mld stp at indl area phase iii near raipur kalan ut chd
Supply installation testing commissioning of real time effluent quality monitoring system with calibration operation and comprehensive mtc for 3 yrs after guarantee period of 12 months at 5 mld stp at indl area phase iii near raipur kalan ut chd
Read moreSupplying , installing, testing, commissioning and 05 years operation and maintenance of online continuous effluent monitoring system (ocems) at the outlet of 87 mld stp bondhar, 30 mld stp elichpur, 15 mld stp sangavi and 10 mld stp dunkin nanded
Supplying , installing, testing, commissioning and 05 years operation and maintenance of online continuous effluent monitoring system (ocems) at the outlet of 87 mld stp bondhar, 30 mld stp elichpur, 15 mld stp sangavi and 10 mld stp dunkin nanded
Read moreDesign engineering, sitc of online continuous effluent monitoring system ocems for 0.8 mld stp sanquelim for measuring bod, cod, tss, flow readings and ph with real time data transmission to gspcb and cpcb incl om 3 yrs ...
Design engineering, sitc of online continuous effluent monitoring system ocems for 0.8 mld stp sanquelim for measuring bod, cod, tss, flow readings and ph with real time data transmission to gspcb and cpcb incl om 3 yrs ...
Read moreSupply installation testing and commissioning of real time effluent quality monitoring system with calibration operation and comprehensive mtc for 3 yrs after guarantee period of 12 months at 5 mld stp at indl area ph 3 near raipur kalan ut chd
Supply installation testing and commissioning of real time effluent quality monitoring system with calibration operation and comprehensive mtc for 3 yrs after guarantee period of 12 months at 5 mld stp at indl area ph 3 near raipur kalan ut chd
Read moreFabrication, manufacturing, testing, supplying, and commissioning of 4 nos. of super suction machines for cleaning underground sewer lines in 150 nos. of ulbs in the state of punjab including 12 months of operation and maintenance under sbm 2.0
Fabrication, manufacturing, testing, supplying, and commissioning of 4 nos. of super suction machines for cleaning underground sewer lines in 150 nos. of ulbs in the state of punjab including 12 months of operation and maintenance under sbm 2.0
Read moreConstruction and commissioning of bore hole by rig of 200 mm dia, under sub div. didwana with 24 months defect liability, 3 years operation and maintenance after completion of defect liability period (arc)
Construction and commissioning of bore hole by rig of 200 mm dia, under sub div. didwana with 24 months defect liability, 3 years operation and maintenance after completion of defect liability period (arc)
Read moreConstruction and commissioning of tube wells by dth/rotary/ comb. rig of 200 mm dia, under phed division nagaur with 24 months defect liability 3 years operation and maintenance after completion of defect liability period
Construction and commissioning of tube wells by dth/rotary/ comb. rig of 200 mm dia, under phed division nagaur with 24 months defect liability 3 years operation and maintenance after completion of defect liability period