Tender Details

Particulars Details
Title
Ttps Mech Ii Ahp Replacing The Clinker Grinder Feed Gate Assembly Power Cylinders And Its Connected Pipe Lines Feed Sump Hydraulic Ejector Assembly Etc In Unit I Bottom Ash Hopper Ash Disposal System During Annual Overhaul 2024 2025
Description
Ttps Mech Ii Ahp Replacing The Clinker Grinder Feed Gate Assembly Power Cylinders And Its Connected Pipe Lines Feed Sump Hydraulic Ejector Assembly Etc In Unit I Bottom Ash Hopper Ash Disposal System During Annual Overhaul 2024 2025
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_461030_1
Reference
Number
CE/TTPS/SE/M-II/No.329/2024-25
Tender Fee 0
EMD 2800
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=547948
Start Date July 06, 2024 22:30
End Date

22/07/2024 ( Expired 273 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of various spares for indure make clinker grinder, hydro ejector and bottom ash hopper feed gate installed at ash handling system of 210 mw atps mppgcl chachai.

Procurement of various spares for indure make clinker grinder, hydro ejector and bottom ash hopper feed gate installed at ash handling system of 210 mw atps mppgcl chachai.

Read more
Tn-11166 supply of m/s dcips make spares for clinker grinder, jet pump and feed gate for bottom ash hopper and wetting head system for wet ash disposal from esp hoppers unit 5 ash handing plant of kstps, kota.

Supply of m/s dcips make spares for clinker grinder, jet pump and feed gate for bottom ash hopper and wetting head system for wet ash disposal from esp hoppers unit 5 ash handing plant of kstps, kota.

Read more
Procurement of air cylinder complete assembly for bottom ash hopper feed gate for unit1 overhauling scheduled in august september 2025 for sgtpp.

Procurement of air cylinder complete assembly for bottom ash hopper feed gate for unit1 overhauling scheduled in august september 2025 for sgtpp.

Read more
Unit iii overhaul 2024 25 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass of bah on urgent basis a

Unit iii overhaul 2024 25 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass of bah on urgent basis a

Read more
Ahp ii unit iii overhaul 2024 25 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass of bah on urgent

Ahp ii unit iii overhaul 2024 25 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in a pass of bah on urgent

Read more
Nctps i se m ii circle ahp dn unit iii removal of settled ash clinker in unit iii common trench from bottom ash hopper to ash handling pump house and interconnection tunnel between unit iii ii by hammering during aoh 2024 2025

Nctps i se m ii circle ahp dn unit iii removal of settled ash clinker in unit iii common trench from bottom ash hopper to ash handling pump house and interconnection tunnel between unit iii ii by hammering during aoh 2024 2025

Read more
Procurement of feed sump for bottom ash hopper clinker grinder jet pump

Procurement of feed sump for bottom ash hopper clinker grinder jet pumpfrom oem mbpl for ahd ntpc barauni

Read more
Ttps mech ii ahp reconditioning of wornout clinker grinder assembly with modified rollers for stage i ii bottom ash hopper

Ttps mech ii ahp reconditioning of wornout clinker grinder assembly with modified rollers for stage i ii bottom ash hopper

Read more
Ahp dn unit i aoh 2024-25 bah overhauling of bottom ash hopper ash discharge gate chute scrapper feeders clinker grinders during overhaul of unit

Ahp dn unit i aoh 2024-25 bah overhauling of bottom ash hopper ash discharge gate chute scrapper feeders clinker grinders during overhaul of unit

Read more
Ttps mechii ahp plastering of refractory cement inside unit i bah and removal of ash slag and debris from bah floor and trenches during annual overhaul 2024 2025

Ttps mechii ahp plastering of refractory cement inside unit i bah and removal of ash slag and debris from bah floor and trenches during annual overhaul 2024 2025

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise