Tender Details

Particulars Details
Title
Dismantling Of 01 No Multi Stage Reciprocating Air Compressor Motor Assly Make Quincy From Grounded S3 Shovel .Repairing Of Same And Installation For Greasing System. Also Repairing Of 01 No Multistage Air Compressor Elgi Make As Float At Ashok Ocp.
Description
Dismantling Of 01 No Multi Stage Reciprocating Air Compressor Motor Assly Make Quincy From Grounded S3 Shovel .Repairing Of Same And Installation For Greasing System. Also Repairing Of 01 No Multistage Air Compressor Elgi Make As Float At Ashok Ocp.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_331418_1
Reference
Number
PE(X)/AOCP/NIT/24-25/60
Tender Fee 0
EMD 3000
Tender Value
Place ASHOK OCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343539
Start Date March 06, 2025 22:30
End Date

13/03/2025 ( Expired 107 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement erection testing and commissioning of oil free screw air compressor (ofsac) using existing 3.3 kv 340 kw ht electric motor drive at mtps ii including dismantling of old elgi make nh265 9 model compressor in sac a b 2 nos

Procurement erection testing and commissioning of oil free screw air compressor (ofsac) using existing 3.3 kv 340 kw ht electric motor drive at mtps ii including dismantling of old elgi make nh265 9 model compressor in sac a b 2 nos

Read more
Repairing of float switch assly. 04of eimco elecon make sdl 611-607 and 619 and udms 612-04, 612-05 and slip ring and brush holder assly. 01 no. part no. 250m000000134 lhd , 811-934 of bhatgaon ug mine and repairing of 02 no. float switches,

Repairing of float switch assly. 04of eimco elecon make sdl 611-607 and 619 and udms 612-04, 612-05 and slip ring and brush holder assly. 01 no. part no. 250m000000134 lhd , 811-934 of bhatgaon ug mine and repairing of 02 no. float switches,

Read more
Complete repairing/rewinding and overhauling of pullen make 150hp, 550v, 2900rpm submersible motor and 6-stage pump sl. no. dharmabandh/s.s.pump/01 of dharmabandh 2-pit colliery under govindpur area-iii

Complete repairing/rewinding and overhauling of pullen make 150hp, 550v, 2900rpm submersible motor and 6-stage pump sl. no. dharmabandh/s.s.pump/01 of dharmabandh 2-pit colliery under govindpur area-iii

Read more
Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area

Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area&#x0d

Read more
Repairing of arm cylinder piston rod eye hole 01 no. and new making and fitting of retainer rings 02 nos. of beml make be-1000-1 shovel si. no.g10258 at dahibari ocp, cv area.

Repairing of arm cylinder piston rod eye hole 01 no. and new making and fitting of retainer rings 02 nos. of beml make be-1000-1 shovel si. no.g10258 at dahibari ocp, cv area.

Read more
Repairing of 01 no. self-er 04 pole 24 volts delcoramy make and rep. of 01 no. alternator assembly 24 volt 80 amp. delcoramy make of motor grader sl. no. 25144 at nichitpur ocp, sijua area

Repairing of 01 no. self-er 04 pole 24 volts delcoramy make and rep. of 01 no. alternator assembly 24 volt 80 amp. delcoramy make of motor grader sl. no. 25144 at nichitpur ocp, sijua area

Read more
Replacement of baring of 02 no.s induction motor (1) 3.3 kv 260kw rpm -1485 sl no- d42142-6 make- teco enm co. ltd (2) 3.3 kv 220 kw rpm-1488 sl no- f330105/3 make- alstom with provision of end cover bearing houseing repairing under ashok ocp

Replacement of baring of 02 no.s induction motor (1) 3.3 kv 260kw rpm -1485 sl no- d42142-6 make- teco enm co. ltd (2) 3.3 kv 220 kw rpm-1488 sl no- f330105/3 make- alstom with provision of end cover bearing houseing repairing under ashok ocp

Read more
Design, supply, erection, installation, testing and commissioning of 01 (one) no. of air-cooled heat exchanger (ache) for dresser rand make gas compressor unit 8 at phase-ii of lakwa thermal power station (ltps), apgcl, maibella.

Design, supply, erection, installation, testing and commissioning of 01 (one) no. of air-cooled heat exchanger (ache) for dresser rand make gas compressor unit 8 at phase-ii of lakwa thermal power station (ltps), apgcl, maibella.

Read more
Repairing of centralized greasing system, steel bracket (qty 12 no.) and radiator (qty 01 no) applicable to tata ex1200vd shovel sl. no. oaby000119 deployed at karma ocp, kuju area.

Repairing of centralized greasing system, steel bracket (qty 12 no.) and radiator (qty 01 no) applicable to tata ex1200vd shovel sl. no. oaby000119 deployed at karma ocp, kuju area.

Read more
Repair of 01 no. memco and ge-600 make 3 phase, 415 volts, 50 hz dc welding transformer and 01 no. sunshine make 3 phase, 415 volts,50 hz welding transformer and 01 no. elgi make compressor motor 11 kw/15hp, 3 phase 415 volts present at dumpersection

Repair of 01 no. memco and ge-600 make 3 phase, 415 volts, 50 hz dc welding transformer and 01 no. sunshine make 3 phase, 415 volts,50 hz welding transformer and 01 no. elgi make compressor motor 11 kw/15hp, 3 phase 415 volts present at dumpersection

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise