Tender Details

Particulars Details
Title
At Apdj Div At Apdj Div Electrical Works In Connection With : Provision Of Direct Reception At L/No.3 At Ncbd By Providing By Crossover At Mydg End.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 72656728
Reference
Number
AP-EL-18-23-24
Tender Fee 0
EMD 25300
Tender Value -
Place Guwahati
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72656728/viewNitPdf_4430162.pdf

Start Date December 22, 2023 18:26
End Date
Expired 15/01/2024

Expired 1005 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Design, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works in connection with provision of cover over shed (cop) end to end platform (5270 sqm) at niphad railway station.

Design, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works in connection with provision of cover over shed (cop) end to end platform (5270 sqm) at niphad railway station.

Read more
Signaling work in connection with provision of connectivity between loop line no.1 (cpu end) to engine siding at aghori khas station of pryj division, ncr.

Signaling work in connection with provision of connectivity between loop line no.1 (cpu end) to engine siding at aghori khas station of pryj division, ncr.

Read more
Electrical work in connection with extension of ncc cnb sick line shed by 30m towards dli end alongwith one examination pit of one vande bharat coach length .electrical work in connection with upgradation of lighting arrangements and provision of pathway at gmc yard kanpur.

Electrical work in connection with extension of ncc cnb sick line shed by 30m towards dli end alongwith one examination pit of one vande bharat coach length .electrical work in connection with upgradation of lighting arrangements and provision of pathway at gmc yard kanpur.

Read more
At apdj div : electrical work for : provision of cover shed, sump roof and pumping arrangement wall, draining arrangement with return valve, hump at both ends of approach road of lhs/rub & pump house for draining out water logging at lhs/rub in connection with sump/roof cover at br. no. 33/a at km 32/1-2 between rqj-jpe, 56a at km 50/5-6 between nmx -bxya, 66/a at km 61/7-8 between atm-dqg & 104/a at km 94 /2-3 between flk - guz etc under the jurisdiction of sr.den/i/apdj .

At apdj div : electrical work for : provision of cover shed, sump roof and pumping arrangement wall, draining arrangement with return valve, hump at both ends of approach road of lhs/rub & pump house for draining out water logging at lhs/rub in connection with sump/roof cover at br. no. 33/a at km 32/1-2 between rqj-jpe, 56a at km 50/5-6 between nmx -bxya, 66/a at km 61/7-8 between atm-dqg & 104/a at km 94 /2-3 between flk - guz etc under the jurisdiction of sr.den/i/apdj .

Read more
Provision/modification of ohe in connection with (1) chhulha: construction of long loop line (cal-750m, ds-pt) with bi-directional 03rd line by extending de of loop line no.-5 at apr end. (2) aal: extension of de up loopl/7 at kte end with dispatch facilty to 03rd line for long haul formation & goods parking line alongwith pathway & lighting facility. (3) loa- construction of dn long haul loop (cal-1500m) by extending de of existing dn loop line no.-1 at kte end with reception facility

Provision/modification of ohe in connection with (1) chhulha: construction of long loop line (cal-750m, ds-pt) with bi-directional 03rd line by extending de of loop line no.-5 at apr end. (2) aal: extension of de up loopl/7 at kte end with dispatch facilty to 03rd line for long haul formation & goods parking line alongwith pathway & lighting facility. (3) loa- construction of dn long haul loop (cal-1500m) by extending de of existing dn loop line no.-1 at kte end with reception facility

Read more
Electrification work in connection with following, sch. a :- construction of officers rest house in connection with kumbh mela 2027 at nashik. ; sch. b :- construction of 200 bedded male barrack with basic amenities at ztc nasik. ; sch. c - provision of escalators (up / down) on pf-02 at malkapur railway station. ; sch. d - provision of escalator on new sanctioned 12m wide fob (csmt end) at nashik road railway station.

Electrification work in connection with following, sch. a :- construction of officers rest house in connection with kumbh mela 2027 at nashik. ; sch. b :- construction of 200 bedded male barrack with basic amenities at ztc nasik. ; sch. c - provision of escalators (up / down) on pf-02 at malkapur railway station. ; sch. d - provision of escalator on new sanctioned 12m wide fob (csmt end) at nashik road railway station.

Read more
Electrical work in connection with provision of first foot over bridge with cover shed at 5 station of n.e.railaway ljn div, provision of essential items for goods shed like tarpaulin , major improvement work like extension of pf no. 02 & water supply pipeline & sanitation and provision of rcc oht, extension of 09 nos. passenger platform at 08 nos. at different stn. at ljn-div, upgradation of infrastructure facilities of new coaching depot at gkp, interlocking of 06 no. lc gates tvu

Electrical work in connection with provision of first foot over bridge with cover shed at 5 station of n.e.railaway ljn div, provision of essential items for goods shed like tarpaulin , major improvement work like extension of pf no. 02 & water supply pipeline & sanitation and provision of rcc oht, extension of 09 nos. passenger platform at 08 nos. at different stn. at ljn-div, upgradation of infrastructure facilities of new coaching depot at gkp, interlocking of 06 no. lc gates tvu

Read more
Electrical work in connection with rebuilding of rail beam of old washing line no. 1 & 2 of lko yard, improvement/up-gradation of north coaching complex washing line and provision of fencing towards north side pathway of sadar washing line and improvement of end ramp at bsb end flooring up to c&w office including repairs to office, etc. at lko, and provision of covered shedand road access for art/lko under lko c&w depot.

Electrical work in connection with rebuilding of rail beam of old washing line no. 1 & 2 of lko yard, improvement/up-gradation of north coaching complex washing line and provision of fencing towards north side pathway of sadar washing line and improvement of end ramp at bsb end flooring up to c&w office including repairs to office, etc. at lko, and provision of covered shedand road access for art/lko under lko c&w depot.

Read more
Name of work :-electrical work in connection with provision of automatic block signaling with centralized traffic control (ctc) system lucknow- gorakhpur cant section, upgradation of maintenance facilities of old coaching depot at gkp, provision of p.p. shelter at 12 nos. of different station over ljn-div, provision of deep tube well with pumphouse at tulsipur and barhni of lucknow division,raising of platform from low level to high level at gangadham pf-1 & 2 & biseshwarganj pf-1 &am

Name of work :-electrical work in connection with provision of automatic block signaling with centralized traffic control (ctc) system lucknow- gorakhpur cant section, upgradation of maintenance facilities of old coaching depot at gkp, provision of p.p. shelter at 12 nos. of different station over ljn-div, provision of deep tube well with pumphouse at tulsipur and barhni of lucknow division,raising of platform from low level to high level at gangadham pf-1 & 2 & biseshwarganj pf-1 &am

Read more
Supply and fixing testing and calibration including necessary transport of direct connected bi-directional energy meter solar meter work to be excecuted as mentioned in the scope of work,sands amr gprs modem with sim card slot complete,aggregate dcu with 4g commuinication,sim charges and band with charges per month per location per annum,modem and dcu installation and configuration charges complete,m and l for box for aggregator at tneb rmg panel complete,cloud charges for 5 years dcu,lt whole current meter complete,supply and fixing of single compartment powder coated gasket sealed lt metering box with stand for housing solar net metering with provision of work to be excecuted as mentioned in the scope of work,calibration of lt bi directional meter fixed by tneb work to be excecuted as mentioned in the scope of work including provision of and ct and pts for complete system all as specified and as directed.

Supply and fixing testing and calibration including necessary transport of direct connected bi-directional energy meter solar meter work to be excecuted as mentioned in the scope of work,sands amr gprs modem with sim card slot complete,aggregate dcu with 4g commuinication,sim charges and band with charges per month per location per annum,modem and dcu installation and configuration charges complete,m and l for box for aggregator at tneb rmg panel complete,cloud charges for 5 years dcu,lt whole current meter complete,supply and fixing of single compartment powder coated gasket sealed lt metering box with stand for housing solar net metering with provision of work to be excecuted as mentioned in the scope of work,calibration of lt bi directional meter fixed by tneb work to be excecuted as mentioned in the scope of work including provision of and ct and pts for complete system all as specified and as directed.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise