Tender Details

Particulars Details
Title
Special Repair Work In 2023 24 At Construction Of C C Road And Drain At Titoli Abadi Portion Of Budaun Bijnor Road To Titoli To Kangavan Gagaoua Link Road
Description
Special Repair Work In 2023 24 At Construction Of C C Road And Drain At Titoli Abadi Portion Of Budaun Bijnor Road To Titoli To Kangavan Gagaoua Link Road
Organisation Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT
Tender Id 2024_CEBLY_876675_1
Reference
Number
Tender Fee 944
EMD 2.81 Lakh
Tender Value
Place BUDAUN
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1495154
Start Date January 03, 2024 14:30
End Date

10/01/2024 ( Expired 496 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Read more
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana

Read more
Dpr for construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (269.000) telibandha chowk (ch. 268.000) on raipur city portion of nh53 at raipur aurang section and ape(10.700) chowk of nh-30 raipur kodebad in chhattisgarh

Dpr for construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (269.000) telibandha chowk (ch. 268.000) on raipur city portion of nh53 at raipur aurang section and ape(10.700) chowk of nh-30 raipur kodebad in chhattisgarh

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Click Here to Download Dockets