Tender Details
Particulars | Details |
---|---|
Title |
Wbmad/Nddm/Phd/N Ie T227/24 25 1
|
Description |
Modification And Up Gradation And Repairing Of 2 (Two) Nos Existing Bio Toilet Of&Amp#X0d
North Dum Dum Municipality &Amp#X0d
|
Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
Tender Id | 2025_MAD_811436_1 |
Reference Number |
WBMAD/NDDM/PHD/NIeT227/24-25 |
Tender Fee | 0 |
EMD | 12272 |
Tender Value | |
Place | UNDER NORTH DUM DUM MUNICIPALITY |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1804129 |
Start Date | February 05, 2025 23:30 |
End Date |
17/02/2025 ( Expired 84 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Wbphed/02/bwn of se/cc of 2025-2026 sl.no.2
Different balance works related with six nos. pwss under khandaghosh block piplon guir punsur talun gopalbera ukhrid under durgapur sub-division of burdwan division, phe dte. district purba-bardhaman&#x0d &#x0d &#x0d &#x0d &#x0d
Read moreRehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Rehabilitation and up-gradation of wardha salod hirapur - pulgaon section of nh 347a from km 134.283 to km 159.075 design chainage km 0.000 to km 24.792 to two laning with paved shoulder in the state of maharashtra on epc mode
Read moreRehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of two nos of toilet blocks boys and girls in ghps school including electrification works in donimalai under csr work 2025-26
Construction of two nos of toilet blocks boys and girls in ghps school including electrification works in donimalai under csr work 2025-26
Read moreProviding tap connections to consumers augmentation and rehabilitation of water supply system, installation of 02 nos new tubewells and repair of existing ohsr 2 lg at samana district patiala under amrut 2.0 scheme part1
Providing tap connections to consumers augmentation and rehabilitation of water supply system, installation of 02 nos new tubewells and repair of existing ohsr 2 lg at samana district patiala under amrut 2.0 scheme part1
Read moreRestoration of bituminous and concrete roadby damage due to laying pipeline from sirishdanga existing glr to ohrs and kendulia proposed pump house to ohrs for jamuria.2nd call
Restoration of bituminous and concrete&#x0d roadby damage due to laying pipeline from&#x0d sirishdanga existing glr to ohrs and&#x0d kendulia proposed pump house to ohrs for&#x0d jamuria.2nd call
Read moreAAAAAAAAAA
Login to viewShifting of utilities like sewerage line, manholes and drains&#x0d etc damaged due to lowering of primary, distribution and&#x0d raw water pipeline......urban water supply scheme of halisahar&#x0d municipality under amrut 2.0
Read moreOperation and maintenance of toilet blocks with food kiosks along bundelkhand expressway
Selection of agencies for operation and maintenance of toilet blocks with food kiosks along bundelkhand expressway &#x0d for package ii and iii&#x0d
Read moreConstruction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.
Read moreof your Industry type