Tender Details
Particulars | Details |
---|---|
Title |
(I) Short Term Improvement Routine Maintenance And Road Safety Improvement Works From Km. 320.00 To Km. 375.570on Nh 128 B In The State Of Up (Ii) Pre/Post Monsoon Works And Road Safety Works From Km 474.300 To Km 523.700 On Nh 31 In Up.
|
Description |
(I) Short Term Improvement Routine Maintenance And Road Safety Improvement Works From Km. 320.00 To Km. 375.570on Nh 128 B In The State Of Up (Ii) Pre/Post Monsoon Works And Road Safety Works From Km 474.300 To Km 523.700 On Nh 31 In Up.
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2025_NHAI_226720_1 |
Reference Number |
NHAI/RO/UP/E/AZM/NH28and31/OM |
Tender Fee | 25000 |
EMD | 6.12 Lakh |
Tender Value | |
Place | As per RFP |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=254280 |
Start Date | February 14, 2025 14:45 |
End Date |
17/03/2025 ( Expired 83 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreOne time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode
One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode
Read moreOne time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode
One time improvement of bypassed stretches of the towns seetharampuram, chinanagampalli, kothapalli, ayyalurivaripalli, dg peta and cs puram from km. 58/635 to km. 99/409 of nh 167b in the state of andhra pradesh on epc mode
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreMaintenance work from km11/2 to km 13/6 (length 2.40 km) section of nh 86ext under short term maintenance contract in the state of madhya pradesh
Maintenance work from km11/2 to km 13/6 (length 2.40 km) section of nh 86ext under short term maintenance contract in the state of madhya pradesh
Read moreof your Industry type