Tender Details

Particulars Details
Title
Repairing Of Kukrail Cut (Bundha) Left Bank In Between Km. 0.500 And Km 0.630 (Lot 24)
Description
Repairing Of Kukrail Cut (Bundha) Left Bank In Between Km. 0.500 And Km 0.630 (Lot 24)
Organisation Government of Uttar Pradesh
Tender Id 2023_UPIDC_815793_24
Reference
Number
01/AEIV/2023-24
Tender Fee 590
EMD 3360
Tender Value
Place Canal Colony
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date June 28, 2023 17:30
End Date
Expired 03/07/2023

Expired 1068 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Clearance of sludge and waste material of chattanwala drain from km. 0.000 to km. 25.000 in distt. bijnor for year 2026-27. lot-4

Clearance of sludge and waste material of chattanwala drain from km. 0.000 to km. 25.000 in distt. bijnor for year 2026-27. lot-4

Read more
Anti erosion work from km. 7.550 to km. 7.800 of bokta barwar bund on the right bank of river rapti in district gorakhpur

Anti erosion work from km. 7.550 to km. 7.800 of bokta barwar bund on the right bank of river rapti in district gorakhpur

Read more
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Read more
One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.

One time improvement work of shahdol city portion to 2 lane with paved shoulders between existing km 132/500 (design km 0/00) to km 141/300 (design km 8.80) (length 8.80 km) on katni shahdol road section of nh-43 in the state of madhya pradesh.

Read more
Consultancy services for preparation of dpr for construction of road d-s-dbo from new to nhdl (ps) specification from km 0.00 to km 150.00 (in pkg i, ii, iii, iv and v) along eastern bank of shyok river in ut of ladakh

Consultancy services for preparation of dpr for construction of road d-s-dbo from new to nhdl (ps) specification from km 0.00 to km 150.00 (in pkg i, ii, iii, iv and v) along eastern bank of shyok river in ut of ladakh

Read more
Development and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector

Development and repair work between km 1 to 8 of talla ramgarh ratighat (arvindon sarni) motor road in bhimtal assembly constituency of nainital district. under state sector

Read more
Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27

Rejinagar - sarbangapur road from chainage 0.00 kmp. to 0.50 km. and 5.50 km. to 8.00 kmp. (in stretches) repairing work under murshidabad highway division no.i. in the district of murshidabad during 2026-27

Read more
General removal of debris and desiltation in engapuzha river- in between thattoorparamb chappathu and kuttippilankandi thazham in puthuppadi panchayath

General removal of debris and desiltation in engapuzha river- in between thattoorparamb chappathu and kuttippilankandi thazham in puthuppadi panchayath

Read more
Providing, laying and compacting 50 mm thick dense bituminous macadam (dbm) including prime coat and 40 mm thick bituminous carpet (bc) including tack coat between km 14.00 to km 26.16 on munna-chander-tungri road

Providing, laying and compacting 50 mm thick dense bituminous macadam (dbm) including prime coat and 40 mm thick bituminous carpet (bc) including tack coat between km 14.00 to km 26.16 on munna-chander-tungri road in aor of 97 rcc under 14 brtf sect

Read more
Selection of consultancy agency for conducting training need assessment (tna) and developing competencies-based curriculum in world bank funded enhanced landscape and ecosystem management (element) project.

Selection of consultancy agency for conducting training need assessment (tna) and developing competencies-based curriculum in world bank funded enhanced landscape and ecosystem management (element) project.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise