Tender Details
Particulars | Details |
---|---|
Title |
Design, Supply, Installation, Testing And Commissioning Of Electronic Interlocking (E.I) System At Itola, Palej And Geratpur (03) Stations Along With Outdoor S&Amp T Work In Connection With Replacement Of Over Aged Indoor And Outdoor Signaling Gears At Itola, Palej And Geratpur (03) Stations Of Vadodara Division, Western Railway.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76757514 |
Reference Number |
BRC_SnT_W_24-25_01 |
Tender Fee | 0 |
EMD | 11.8 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/76757514/viewNitPdf_4675815.pdf |
Start Date | October 16, 2024 00:27 |
End Date |
11/11/2024 ( Expired 181 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Read moreDesign, engineering, manufacture, supply, erection, testing and commissioning of 50 mva, 132/33 kv three phase power transformer with allied works for the project replacement of aged and old 16.66 mva,132/33kv single phase power transformers at gss
Design, engineering, manufacture, supply, erection, testing and commissioning of 50 mva, 132/33 kv three phase power transformer with allied works for the project replacement of aged and old 16.66 mva,132/33kv single phase power transformers at gss p
Read moreDesign, engineering, supply , construction, erection, testing and commissioning of cumulative 30 mw (ac) ground based solar pv power plants along with 10 years plant o and m at three (03) sites at sccl.
Design, engineering, supply, construction, erection, testing and commissioning of cumulative 30 mw (ac) ground based solar pv power plants along with 10 years plant o and m at three (03) sites at sccl
Read moreDesign, engineering, supply , construction, erection, testing and commissioning of cumulative 107 mw (ac) ground/ob dump based solar pv power plants along with 10 years plant o and m at three (03) sites at sccl.
Design, engineering, supply, construction, erection, testing and commissioning of cumulative 107 mw (ac) ground/ob dump based solar pv power plants along with 10 years plant o and m at three (03) sites at sccl.
Read moreSurvey, design, supply, installation, testing and commissioning of trackside kavach equipment at stations/lc gates locations including erection of towers and associated works required for kavach in kota-ruthiyai section and sogaria-kota c section (166 rkm) of kota division of west central railway. this also includes supply, trenching, duct laying, blowing, splicing, termination, etc. of 24 & 48 fiber ofc with route diversity wherever required.
For complete deion and other details, please refer to tender
Read moreSurvey, design, supply, foundation, fabrication, erection, testing & commissioning of towers in connection with installation of kavach on ranital-duvvada section of east coast railway.
For complete deion and other details, please refer to tender
Read moreRepairing seat of d155 dozer13494 of both cabin door along with replacement of plasto safety glass, operator seat of dozer sl no13494, design, fabrication and fitting of roll over protection guard of operator cabin safety for d155 dozer 13494
Repairing seat of d155 dozer13494 of both cabin door along with replacement of plasto safety glass, operator seat of dozer sl no 13494, design, fabrication and fitting of roll over protection guard of operator cabin safety for d155 dozer
Read moreDesign, supply, erection, testing and commissioning of 220/2x25 kv & 132/2x25 kv traction sub-station along with sp/ssps between mathura-dholpur-antri-bina section of north central railway in connection with raising of speed to 160 kmph/200 kmph.
For complete deion and other details, please refer to tender
Read moreUdvada - electrical (air-conditioning) work in connection with replacement of indoor & outdoor signaling gears (excluding composite tender portion)
For complete deion and other details, please refer to tender
Read moreConducting feasibility study, investigation, detailed survey, detailed project report (dpr) preparation and detailed design work in connection with elimination of level crossings by construction of grade separators (rob/rub)/merger/di of roads on dabhoi-chhotaudepur section (17 nos) & vadodara-geratpur section (2 nos) of vadodara division (total 19 nos).
For complete deion and other details, please refer to tender
Read moreof your Industry type