Shifting And Crossing Works Of Pipe And Other Work In Itaura Buzurg Water Supply Scheme For Alignment Of Ganga Expressway In District Raebareli (Package 01)
Description
Shifting And Crossing Works Of Pipe And Other Work In Itaura Buzurg Water Supply Scheme For Alignment Of Ganga Expressway In District Raebareli (Package 01)
Organisation Government of Uttar Pradesh
Tender Id 2023_UPJNG_811239_1
Reference
Number
272/M-7/22 Dated 09.06.2023 (Package 01)
Tender Fee 11800
EMD 3.89 Lakh
Tender Value -
Place SE, Circle Office UPJN (Rural), Lucknow
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date June 12, 2023 14:30
End Date
Expired 04/07/2023

Expired 1202 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Operation and maintenance of food kiosk of package viii of purvanchal expressway

Selection of an agency for operation and maintenance of food kiosk at package viii of purvanchal expressway at chainage 315.900 km lhs

Read more
Shifting of a part of existing 11 kv line from the railway boundary at komarpur railway crossing

Shifting of a part of chakta and ankhona 11kv feeder from the railway boundary at komarpur railway crossing emanating from kandra 33/11kv sub stn under katwa division under purba bardhaman district under west bengal

Read more
Relocation of mb existing pipe alignment with new pipeline due to construction of rob at lc.no:228t wadiaram railway crossing of chegunta mandal, medak dist, gajwel segment

Relocation of mb existing pipe alignment with new pipeline due to construction of rob at lc.no:228t wadiaram railway crossing of chegunta mandal, medak dist, gajwel segment

Read more
Shifting of 1 nos. 200 kva transformer exists in the alignment of plots in sector-33 u/e karnal.(rates taken in dnit exclusive gst)

Shifting of 1 nos. 200 kva transformer exists in the alignment of plots in sector-33 u/e karnal.(rates taken in dnit exclusive gst)

Read more
Relocation of mb existing pipe alignment with new pipeline due to construction of rob at lc.no:228t wadiaram railway crossing of chegunta mandal, medak dist under gajwel segment

Relocation of mb existing pipe alignment with new pipeline due to construction of rob at lc.no:228t wadiaram railway crossing of chegunta mandal, medak dist under gajwel segment

Read more
Balance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.

Balance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.

Read more
Rasing of manhole sewer house connecting chamber and shifting of sewer house connections at jamunahiya to gd binnani degree college marg shuklaha tiraha to dumuhiya tiraha under road widening pwd deposite programme

Rasing of manhole sewer house connecting chamber and shifting of sewer house connections at jamunahiya to gd binnani degree college marg shuklaha tiraha to dumuhiya tiraha under road widening pwd deposite programme

Read more
Shifting of water supply pipe line and house connections at jamunahiya to gd binnani degree college marg patel chauraha to kanshi ram avas chauraha near petrol pump under road widening pwd deposite programme

Shifting of water supply pipe line and house connections at jamunahiya to gd binnani degree college marg patel chauraha to kanshi ram avas chauraha near petrol pump under road widening pwd deposite programme

Read more
Shifting/diversion and modification of electrical utilities and transmission line(s) of 11kv and above infringing the alignment,comprising dismantling of existing towers/poles,conductors and allied electrical installations,supply, erection,stringing,

(continue ) testing and commissioning of new towers/poles with allied foundation and other allied works etc. schedule-a- b/w aligarh jn.stn and harduaganj stn.schedule-b- shifting of ncr transmission line between aligarh jn.stn and daud khan stn

Read more
Carrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.

Carrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.