Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting And Crossing Works Of Pipe And Other Work In Itaura Buzurg Water Supply Scheme For Alignment Of Ganga Expressway In District Raebareli (Package 01)
|
| Description |
Shifting And Crossing Works Of Pipe And Other Work In Itaura Buzurg Water Supply Scheme For Alignment Of Ganga Expressway In District Raebareli (Package 01)
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPJNG_811239_1 |
|
Reference Number |
272/M-7/22 Dated 09.06.2023 (Package 01) |
| Tender Fee | 11800 |
| EMD | 3.89 Lakh |
| Tender Value | - |
| Place | SE, Circle Office UPJN (Rural), Lucknow |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | June 12, 2023 14:30 |
| End Date |
Expired
04/07/2023
Expired 1202 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Operation and maintenance of food kiosk of package viii of purvanchal expressway
Selection of an agency for operation and maintenance of food kiosk at package viii of purvanchal expressway at chainage 315.900 km lhs
Read moreShifting of a part of existing 11 kv line from the railway boundary at komarpur railway crossing
Shifting of a part of chakta and ankhona 11kv feeder from the railway boundary at komarpur railway crossing emanating from kandra 33/11kv sub stn under katwa division under purba bardhaman district under west bengal
Read moreRelocation of mb existing pipe alignment with new pipeline due to construction of rob at lc.no:228t wadiaram railway crossing of chegunta mandal, medak dist, gajwel segment
Relocation of mb existing pipe alignment with new pipeline due to construction of rob at lc.no:228t wadiaram railway crossing of chegunta mandal, medak dist, gajwel segment
Read moreShifting of 1 nos. 200 kva transformer exists in the alignment of plots in sector-33 u/e karnal.(rates taken in dnit exclusive gst)
Shifting of 1 nos. 200 kva transformer exists in the alignment of plots in sector-33 u/e karnal.(rates taken in dnit exclusive gst)
Read moreRelocation of mb existing pipe alignment with new pipeline due to construction of rob at lc.no:228t wadiaram railway crossing of chegunta mandal, medak dist under gajwel segment
Relocation of mb existing pipe alignment with new pipeline due to construction of rob at lc.no:228t wadiaram railway crossing of chegunta mandal, medak dist under gajwel segment
Read moreBalance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.
Balance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.
Read moreRasing of manhole sewer house connecting chamber and shifting of sewer house connections at jamunahiya to gd binnani degree college marg shuklaha tiraha to dumuhiya tiraha under road widening pwd deposite programme
Rasing of manhole sewer house connecting chamber and shifting of sewer house connections at jamunahiya to gd binnani degree college marg shuklaha tiraha to dumuhiya tiraha under road widening pwd deposite programme
Read moreShifting of water supply pipe line and house connections at jamunahiya to gd binnani degree college marg patel chauraha to kanshi ram avas chauraha near petrol pump under road widening pwd deposite programme
Shifting of water supply pipe line and house connections at jamunahiya to gd binnani degree college marg patel chauraha to kanshi ram avas chauraha near petrol pump under road widening pwd deposite programme
Read moreShifting/diversion and modification of electrical utilities and transmission line(s) of 11kv and above infringing the alignment,comprising dismantling of existing towers/poles,conductors and allied electrical installations,supply, erection,stringing,
(continue ) testing and commissioning of new towers/poles with allied foundation and other allied works etc. schedule-a- b/w aligarh jn.stn and harduaganj stn.schedule-b- shifting of ncr transmission line between aligarh jn.stn and daud khan stn
Read moreCarrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Carrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Read moreof your Industry type