Tender Details
Particulars | Details |
---|---|
Title |
Widening Of Coal Corridor Road From Balaram Zero Point To Jagannath Underpass Through Bharatpur Ocp Under Bharatpur Area.
|
Description |
Widening Of Coal Corridor Road From Balaram Zero Point To Jagannath Underpass Through Bharatpur Ocp Under Bharatpur Area.
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_MCL_297719_1 |
Reference Number |
MCL/Samb/Civil-TC/e-Tender/ 23-24/25 Dt.05.01.2024 |
Tender Fee | 0 |
EMD | 16.13 Lakh |
Tender Value | |
Place | Bharatpur OCP, Bharatpur Area., Odisha. |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=308368 |
Start Date | January 07, 2024 15:30 |
End Date |
22/01/2024 ( Expired 480 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreStrengthening of road from nh208 to fatikroy via chebri chowmuhani under kumarghat pwd r and b division under ridf xxx of nabard job no tp_com_218_2024_25
Strengthening of road from nh208 to fatikroy via chebri chowmuhani under kumarghat pwd r and b division under ridf xxx of nabard job no tp_com_218_2024_25
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read morePreparation of detailed project report (dpr) for implementation of a 4/6/8- lane access - controlled semi ring road through vcf from bhogapuram to rambilli
Preparation of detailed project report (dpr) for implementation of a 4/6/8- lane access - controlled semi ring road through vcf from bhogapuram to rambilli
Read moreof your Industry type