Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Work For The C/O Sarai Bhawan At Sunnam In District Kinnaur Hp (Sh Building Portion, Ws And Si And Site Development
|
| Description |
Balance Work For The C/O Sarai Bhawan At Sunnam In District Kinnaur Hp (Sh Building Portion, Ws And Si And Site Development
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2024_PWD_90467_4 |
|
Reference Number |
PW-KNR-E-Tender/24-1697-1706 dated 09-07-2024 |
| Tender Fee | 2000 |
| EMD | 1.1 Lakh |
| Tender Value | |
| Place | Sunnam, under Pooh Sub Division. |
| Link |
View Original Tender Notice
https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=133869 |
| Start Date | July 12, 2024 14:30 |
| End Date |
Expired
20/07/2024
Expired 716 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Extension of stadium at kalpa in district kinnaur (hp) (sh -c/o ceiling beam and slab
Extension of stadium at kalpa in district kinnaur (hp) (sh -c/o ceiling beam and slab
Read moreConstruction of rajiv gandhi govt. model day boarding school at kangoo distt. hamirpur (h.p.)
Building portion, ws , si, septic tank, rain water harvesting tank and site development, providing e.i. smart class system, cctv surveillance system, fire fighting system, 3 nos. lifts there in. (deposit work).
Read moreDevelopment works in unauthorized colonies. c/o roads and s.w. brick work drains at east vinod nagar, j-block in patparganj (a.c.-57) (regn. no. 47)
Development works in unauthorized colonies. c/o roads and s.w. brick work drains at east vinod nagar, j-block in patparganj (a.c.-57) (regn. no. 47)
Read moreDevelopment works in unauthorized colonies. c/o roads and s.w. rcc and brick work drains at shiv vihar phase-3 (part-2) in mustafabad (a.c.69) (regn. no.766).
Development works in unauthorized colonies. c/o roads and s.w. rcc and brick work drains at shiv vihar phase-3 (part-2) in mustafabad (a.c.69) (regn. no.766).
Read moreDevelopment works in unauthorized colonies. c/o roads and s.w. brick work drains at west vinod nagar, e-block (part-1) in patparganj ac-27 (regn. no. 610)
Development works in unauthorized colonies. c/o roads and s.w. brick work drains at west vinod nagar, e-block (part-1) in patparganj ac-27 (regn. no. 610)
Read moreSpecial repair of court complex building at mandi (h.p) (sh- providing and fixing wood work, wall paneling and wooden flooring work etcetera in court no.iii).
Special repair of court complex building at mandi (h.p) (sh- providing and fixing wood work, wall paneling and wooden flooring work etcetera in court no.iii).
Read moreAnnual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Annual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Read moreRmoei fans i/c sub-station, dg set, lifts, wet riser system in office cum lab building for gsi karunamoyee at sector-ii, salt lake, kolkata-91 during 2026-27. (sh: providing services for operation and maintenance of iei, pump dg and sub-station equipments, afas, wet riser etc.).
Read morePlanning, designing and construction of residential and non residential infrastructure in phasei for establishment of cisf 12th reserve battalion at village jamunia talab, dist sehore (mp) pkg-i in epc mode-i. sh: c/o 242 nos. t-ii qtrs (15 blocks of stilt plus 4 and 1 block of gf), 12 nos t-iii qtrs (stilt plus 3), 5 nos t-i qtrs (g plus 2), 2 nos t-v qtrs. (duplex), training block (g plus 1), 10 bedded hospital (g plus 1), gos mess (gf), single accommodation for 57 sos (g plus 2), store block and tradesmen shop (g plus1), 701 mens barracks 3 blocks (g plus 2), quarter guard (gf), admin/ communication block (g plus 2), dhobi ghat (gf), 2 nos. elect sub stations, stp, 2 nos. ug sumps with pump rooms, i/c internal w/s, sanitary and ei, lifts, dg sets, fire alarm system, firefighting, solar pv power generation system, cctv system, air conditioning system, external civil and electrical service connections, and comprehensive development works .................. bulk services.
Read moreBalance work for the c/o sarai bhawan at sunnam in district kinnaur hp (sh- building portion, ws and si and site development)
Balance work for the c/o sarai bhawan at sunnam in district kinnaur hp (sh- building portion, ws and si and site development)
Read moreof your Industry type