Tender Details

Particulars Details
Title
Tender For Monkey Catching And Transporting Them Out Of Pachmarhi Third Call
Description
Tender For Monkey Catching And Transporting Them Out Of Pachmarhi Third Call
Organisation Directorate General Defence Estates | Central Govt. Ministry/Department
Tender Id 2025_DGDE_701745_1
Reference
Number
62/SI/368803698
Tender Fee 1000
EMD 20000
Tender Value -
Place Cantonment Board Pachmarhi
Link
View Original Tender Notice

https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=789804

Start Date April 23, 2025 18:30
End Date
Expired 29/04/2025

Expired 532 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Catching terror monkey in municipal limit, municipal committee, dharuhera. (year 2026-27)

Catching terror monkey in municipal limit, municipal committee, dharuhera. (year 2026-27)

Read more
Catching of monkeys in all divisions in rmc and releasing them in deep forest away from ramagundam city (under gf)

Catching of monkeys in all divisions in rmc and releasing them in deep forest away from ramagundam city (under gf)

Read more
The work of catching stray animals and releasing them in government subsidized cowsheds and other deserted places where sufficient fodder and water is available. (all resources including labour)

The work of catching stray animals and releasing them in government subsidized cowsheds and other deserted places where sufficient fodder and water is available. (all resources including labour)

Read more
Engagement of an agency for independent third-party evaluation of the works carried out under the safe city project

Engagement of an agency for independent third-party evaluation of the works carried out under the safe city project

Read more
Work for the witnessing of the entire process of third party coal sampling work carried out by tpsa and its technical service provider at various railway siding/mines end at the loading end of m/s wcl and collection and shifting of mppgcl

Work for the witnessing of the entire process of third party coal sampling work carried out by tpsa and its technical service provider at various railway siding/mines end at the loading end of m/s wcl and collection and shifting of mppgcl

Read more
Handling and transport on lumpsum basis - lifting 700000 sugar bag (50 kg capacity) from the dryer house and stacking them in various warehouses to a hight of 56 bags,handling and transport on lumpsum basis - loading 700000 sugar bags (50 kg capacity) onto trucks form mill ware house during the off-season/season,handling and transport on lumpsum basis - stacking 10000 sacks up to a height of 48 sacks from one location to another within the warehouse,handling and transport on lumpsum basis - transporting 10000 sugar filled sacks from one ware house to another and stacking them to a height of 48 sacks,handling and transport on lumpsum basis - stitching refilling weighing and stacking 7000 torn or damaged 50 kg capacity sugar sacks,handling and transport on lumpsum basis - stacking 5000 sacks of sugar 50kg capacity in the dryer house to a height of 48 sacks as required,handling and transport on lumpsum basis - lifting 50 kg capacity bags filled with brown sugar biss sugar ardhnam 8000 sugar from the warehouse a

Handling and transport on lumpsum basis - lifting 700000 sugar bag (50 kg capacity) from the dryer house and stacking them in various warehouses to a hight of 56 bags,handling and transport on lumpsum basis - loading 700000 sugar bags (50 kg capacity) onto trucks form mill ware house during the off-season/season,handling and transport on lumpsum basis - stacking 10000 sacks up to a height of 48 sacks from one location to another within the warehouse,handling and transport on lumpsum basis - transporting 10000 sugar filled sacks from one ware house to another and stacking them to a height of 48 sacks,handling and transport on lumpsum basis - stitching refilling weighing and stacking 7000 torn or damaged 50 kg capacity sugar sacks,handling and transport on lumpsum basis - stacking 5000 sacks of sugar 50kg capacity in the dryer house to a height of 48 sacks as required,handling and transport on lumpsum basis - lifting 50 kg capacity bags filled with brown sugar biss sugar ardhnam 8000 sugar from the warehouse a

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Tender for monkey catching and releasing them to natural habitat

Tender for monkey catching and releasing them to natural habitat

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise