Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Bid Invitation: Widening Of Bridges On Nh 66 🏗️ The National Highways Authority Of India (Nhai) Is Seeking Bids For The Balance Work Of Widening Four Existing Two Lane Major Bridges As Part Of The 6 Laning Of The Kozhikode Bypass (Calicut Bypass) From Vengalam To Ramanattukara Junction On Nh 66, Covering A Distance Of 28.400 Km In Kerala. 📅 Bid Submission Deadline: April 22, 2024, 11:00 Am Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 99,88,000 Interested Bidders Must Possess The Requisite Expertise And Experience In Infrastructure Development, Particularly In Bridge Construction. Detailed Bids Should Encompass Technical Specifications, Cost Estimates, And A Timeline For Project Completion, Adhering To The Highest Standards Of Quality And Safety. Keywords: Nhai, Infrastructure, Bridge Widening, Highway Construction, Public Sector Undertaking, Bid, Tender, Emd, Kozhikode Bypass, Nh 66, Kerala| Particulars | Details |
|---|---|
| Title |
Balance Work Of Widening Of 4 Nos Existing 2 Lane Major Bridge Of 6 Laning Of Kozhikode Bypass (Calicut Bypass) (Vengalam To Ramanattukara Jn.) Section Of Nh 66 From Design Chainage Km 230.400 To Design Chainage Km 258.800 (Tl 28.400 Km) In Kerala
|
| Description |
Balance Work Of Widening Of 4 Nos Existing 2 Lane Major Bridge Of 6 Laning Of Kozhikode Bypass (Calicut Bypass) (Vengalam To Ramanattukara Jn.) Section Of Nh 66 From Design Chainage Km 230.400 To Design Chainage Km 258.800 (Tl 28.400 Km) In Kerala
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_188052_1 |
|
Reference Number |
NHAI/11021/KL/ Kozhikodebypass/2024-Proc |
| Tender Fee | 10000 |
| EMD | 99.88 Lakh |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=205761 |
| Start Date | February 24, 2024 00:00 |
| End Date |
Expired
22/04/2024
Expired 906 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
Read moreEngagement of user fee agency through e-quotation for eq for mampuzha fee plaza at km 250.300 of kozhikode bypass (i.e. vengalam jn. to ramanattukara jn.) from km 230.400 to km 258.800 (design chainage) of nh-66 in the state of kerala
Engagement of user fee agency through e-quotation for eq for mampuzha fee plaza at km 250.300 of kozhikode bypass (i.e. vengalam jn. to ramanattukara jn.) from km 230.400 to km 258.800 (design chainage) of nh-66 in the state of kerala
Read moreFour laning of nh-146 from design chainage km 59.475 (existing chainage km 81.240 near vidisha) to design chainage km 88.600 (existing chainage km 110.315 near gyaraspur) in madhya pradesh on ham under bmp
Four laning of nh-146 from design chainage km 59.475 (existing chainage km 81.240 near vidisha) to design chainage km 88.600 (existing chainage km 110.315 near gyaraspur) in madhya pradesh on ham under bmp
Read moreFour laning of gyaraspur- rahatgarh section of nh-146 from design chainage km. 88.361 to design chainage at km. 124.470 in the state of madhya pradesh on ham mode.
Four laning of gyaraspur- rahatgarh section of nh-146 from design chainage km. 88.361 to design chainage at km. 124.470 in the state of madhya pradesh on ham mode.
Read more4-laning of jagtial karimnagar section of nh-563 from jagtial bypass start at design ch. 0.000 (existing chainage 90/500 on nh-63) to design ch.28.000 (existing chainage 23/350 on nh-563) neargangadhara (dl 28.000 km) under nh(o) on ham in telangana
4-laning of jagtial karimnagar section of nh-563 from jagtial bypass start at design ch. 0.000 (existing chainage 90/500 on nh-63) to design ch.28.000 (existing chainage 23/350 on nh-563) neargangadhara (dl 28.000 km) under nh(o) on ham in telangana
Read moreEngagement of user fee agency through eq at nalavadi (km 161.200) on four laning of hubballi hospet section of nh-63 from km 128.850 (design chainage) to km 272.571 (design chainage) in karnataka
Engagement of user fee agency through eq at nalavadi (km 161.200) on four laning of hubballi hospet section of nh-63 from km 128.850 (design chainage) to km 272.571 (design chainage) in karnataka
Read moreIndependent engineer services during operation and maintenance stage of four laning of rampur kathgodam section of nh 87 from design chainage km 43.446 design chainage 93.226 km package ii in the state of uttarakhand
Independent engineer services during operation and maintenance stage of four laning of rampur kathgodam section of nh 87 from design chainage km 43.446 design chainage 93.226 km package ii in the state of uttarakhand
Read moreConstruction of four lane arrah bypass (asni to baonpali) from km 0.000 (design chainage) to km 4.500 (design chainage) of nh319 (old nh30) in the state of bihar on epc mode
Construction of four lane arrah bypass (asni to baonpali) from km 0.000 (design chainage) to km 4.500 (design chainage) of nh319 (old nh30) in the state of bihar on epc mode
Read moreFour laning of kereya to keyondpani section of nh 143d ing from km 28.953 (design chainage) to km 59.300 (design chainage) (length 30.347 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package ii)
Four laning of kereya to keyondpani section of nh 143d ing from km 28.953 (design chainage) to km 59.300 (design chainage) (length 30.347 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package ii)
Read moreFour laning of keyondpani to latra section of nh 143d ing from km 59.300 (design chainage) to km 103.000 (design chainage) (length 43.7 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iii)
Four laning of keyondpani to latra section of nh 143d ing from km 59.300 (design chainage) to km 103.000 (design chainage) (length 43.7 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iii)
Read moreof your Industry type