Tender Details
Particulars | Details |
---|---|
Title |
Supply And Delivery Of Upvc Equal Tee, Upvc Extra Coupler And Solvent Cement Under Barasat (A M) Division.
|
Description |
Supply And Delivery Of Upvc Equal Tee, Upvc Extra Coupler And Solvent Cement Under Barasat (A M) Division.
|
Organisation | Government of West Bengal |
Tender Id | 2023_WRDD_605227_1 |
Reference Number |
WBWRDD/EEAM/BST/eNIQ14/2023-24 |
Tender Fee | |
EMD | 8800 |
Tender Value | |
Place | Executive Engineer (A-M) Barasat (A-M) Division |
Link | https://wbtenders.gov.in |
Start Date | November 18, 2023 00:25 |
End Date |
05/12/2023 ( Expired 525 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreDesign, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreAAAAAAAAAA
Login to viewOperation and guarding of the pumping machinery and electrical installation at pump house of bundwanspot w/s scheme under purulia mechanical division phe dte. in the district of purulia.
Read moreConstruction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an
Read moreSupply and installation of ict equipments for online courts,
Supply and installation of ict equipments for online courts, &#x0d live streaming and paperless court in court complexes under e&#x0d courts project phase iii
Read moreConstruction of revetment of tower no 37 of 132 kv jwalapur-roorkee line associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Construction of revetment of tower no 37 of 132 kv jwalapur-roorkee line associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Read moreConstruction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Construction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Read moreAppointment of independent engineer for operation and maintenance (o and m) period on completed road projects (sh and nh) under bot (toll) bot (toll plus annuity) bot (annuity) and omt mode in the state of madhya pradesh
Appointment of independent engineer for operation and maintenance (o and m) period on completed road projects (sh and nh) under bot (toll) bot (toll plus annuity) bot (annuity) and omt mode in the state of madhya pradesh
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreof your Industry type