Tender Details
Particulars | Details |
---|---|
Title |
Providing Assistance For Uninterrupted Coal Coneyance From Wagon Tipplers 5 6 To Crushers And Crusher To Bunkers Due To Complete Wet Coal At Different Chutes,Location And Transfer Points In General ?Sub Division/Chp/Stage Iii Iv/Dr Nttps, As And When Required During The Period From 01.11.2024 Or From The Date Of Commencement Of Work To 31.03.2025
|
Description |
Providing Assistance For Uninterrupted Coal Coneyance From Wagon Tipplers 5 6 To Crushers And Crusher To Bunkers Due To Complete Wet Coal At Different Chutes,Location And Transfer Points In General ?Sub Division/Chp/Stage Iii Iv/Dr Nttps, As And When Required During The Period From 01.11.2024 Or From The Date Of Commencement Of Work To 31.03.2025
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 762289 |
Reference Number |
E-13/24-25 of CE/OM/Dr.NTTPS(SE/OM/CHP) |
Tender Fee | 616 |
EMD | 8700 |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | November 02, 2024 00:30 |
End Date |
06/11/2024 ( Expired 166 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Critical repair works and movement of locos dozers from railway marshaling yard to loco shed/maintenance pit/dozer shed/diesel bunk and back to railway marshalling yard /pile, coal yard in lem/chp/dr nttps during the period from 01/04/2025 or from the date of commencement of work to 31/03/2026.
Critical repair works and movement of locos dozers from railway marshaling yard to loco shed/maintenance pit/dozer shed/diesel bunk and back to railway marshalling yard /pile, coal yard in lem/chp/dr nttps during the period from 01/04/2025 or from the date of commencement of work to 31/03/2026.
Read morePicking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5metres per second pertains to stage-3 4 of chp, transport of shale to dump yard within the premises of chp (distance: 0 to 5 km) and cleaning of drains at crushed stock yards of stg-34 as and when required during the period from 01.04.2025 or commencement of the work to 31.03.2026
Read moreProviding assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreProviding assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreMtps i - civil circle up keeping of toilets in the railway yard office area, decanting pump house area, wagon tippler area, loco shed area, primary crusher house area and coal handling plant for the period of one year from the date of commencement
Mtps i - civil circle up keeping of toilets in the railway yard office area, decanting pump house area, wagon tippler area, loco shed area, primary crusher house area and coal handling plant for the period of one year from the date of commencement
Read moreProviding assistance for uninterrupted coal conveyance from wagon tipplers 1-4 to crushers and crusher to bunkers due to complete wet coal at different chutes, locations and transfer points in general sub-division/chp/stage-iii/dr.nttps as and when required during the period from 01.12.2024 or from the date of commencement of work to 31.03.2025
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1-4 to crushers and crusher to bunkers due to complete wet coal at different chutes, locations and transfer points in general sub-division/chp/stage-iii/dr.nttps as and when required during the period from 01.12.2024 or from the date of commencement of work to 31.03.2025
Read moreComplete collection and preparation of coal samples for rakes received at chp/dr.nttps duly arranging the required manpower, materials, transportation as per the scope of work from 01-12-24 or from the actual date of commencement of work up to 31-03-25 or until commencement of work by new agency fixed by hq whichever is earlier
Complete collection and preparation of coal samples for rakes received at chp/dr.nttps duly arranging the required manpower, materials, transportation as per the scope of work from 01-12-24 or from the actual date of commencement of work up to 31-03-25 or until commencement of work by new agency fixed by hq whichever is earlier
Read moreProviding assistance for uninterrupted coal coneyance from wagon tipplers 5 6 to crushers and crusher to bunkers due to complete wet coal at different chutes,location and transfer points in general ?sub-division/chp/stage-iii iv/drnttps, as and when required during the period from 01.11.2024 or from the date of commencement of work to 31.03.2025
Providing assistance for uninterrupted coal coneyance from wagon tipplers 5 6 to crushers and crusher to bunkers due to complete wet coal at different chutes,location and transfer points in general ?sub-division/chp/stage-iii iv/drnttps, as and when required during the period from 01.11.2024 or from the date of commencement of work to 31.03.2025
Read moreTn-5326 providing extra manpower for assistance in housekeeping, jali/chute cleaning of complete chp area including wagon tipplers, stacker-cum-reclaimer, imwb, crusher,conveying system, various chutes and bunker floor etc in chp area, kstps, kota
Providing extra manpower for assistance in housekeeping, jali/chute cleaning of complete chp area including wagon tipplers, stacker-cum-reclaimer, imwb, crusher,conveying system, various chutes and bunker floor etc in chp area, kstps, kota
Read moreAmc to attend various routine prive and breakdown mech mtc work of all the heavy eqp under hemc wagon tipplers stacker reclaimers pri sec crushers dust suppression dust extraction ventilation sys and crusher grinder of coal sampling lab
Amc to attend various routine prive and breakdown mech mtc work of all the heavy eqp under hemc wagon tipplers stacker reclaimers pri sec crushers dust suppression dust extraction ventilation sys and crusher grinder of coal sampling lab
Read moreof your Industry type