Tender Details
Particulars | Details |
---|---|
Title |
Drilling And Installation Of Tubewell In Jasbir Colony Ward No. 2 Mc Panipat (Rural). (Recall)
|
Description |
Drilling And Installation Of Tubewell In Jasbir Colony Ward No. 2 Mc Panipat (Rural). (Recall)
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_316892_1 |
Reference Number |
2023658BC563 4376 4357 9E90 AEEEA8B52265286ULB |
Tender Fee | 1000 |
EMD | 10740 |
Tender Value | |
Place | Municipal Corporation Panipat |
Link | https://etenders.hry.nic.in |
Start Date | October 02, 2023 14:30 |
End Date |
12/10/2023 ( Expired 606 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreDesign, supply and installation of hrscc (high rate solid contact clarifier) in rcf wtp
Design, supply and installation of hrscc (high rate solid contact clarifier) in rcf wtp
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreConst. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Const. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreSupply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502.
Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreof your Industry type