Tender Details

About Tender

🔧 Maintenance And Repair Services For Electrical Equipment 💡 Mahanadi Coalfields Limited (Mcl), A Public Sector Undertaking, Is Seeking Bids For The Day To Day Maintenance, Repairing, And Overhauling Of Switches (Vcb/Ocb), Starter Panels, And Transformers At Their Talcher Mine. 🏭 📅 Bid Submission Deadline: July 15, 2024, 5:00 Pm The Contract Is Expected To Be Awarded On An As And When Required Basis For A Period Of Two Years. 📋 Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 2,21,000. 💰 Detailed Bids Should Outline The Service Scope, Methodology, And Compliance With Safety And Quality Standards. Keywords: Maintenance, Repair, Overhauling, Electrical Equipment, Mahanadi Coalfields Limited, Mcl, Talcher, Public Sector Undertaking, Tender, Bid, Emd
Particulars Details
Title
Day To Day Maintenance, Repairing And Overhauling Of Switches (Vcb/Ocb), Starter Panels And Transformers Of Mine Of Jagannath
Description
Day To Day Maintenance, Repairing And Overhauling Of Switches (Vcb/Ocb), Starter Panels And Transformers Of Mine Of Jagannath&#X0d Ocp For A Period Of Two(02) Years On As And When Required Basis
Organisation Mahanadi Coalfields Limited | Public Sector Undertakings
Tender Id 2024_MCL_311582_1
Reference
Number
GM(JA)/EnM/e-Tender/ 24-25/ E-667/32 DTD. 29/06/2024
Tender Fee 0
EMD 22100
Tender Value
Place talcher
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=322900
Start Date July 02, 2024 15:30
End Date

15/07/2024 ( Expired 309 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Biennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps

Biennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps

Read more
Round the clock operation, maintenance and overhauling of central ac plants of ucb, 220 kv switchyard control room, package ac plants, air washer systems and maintenance and overhauling of window/split acs, water coolers, ros. all connected piping,

Valves etc. of stage-i and stage-ii, ghtp, lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling under mechanical aux. mtc. cell on lump-sum basis.lehra-mohabbat and mtc. work of acs/ros systems etc. gndtp, bathinda falling

Read more
Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode

Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode

Read more
Development, operation and maintenance of ropeway between tawang monastery to p t tso lake in tawang district in the state of arunachal pradesh on hybrid annuity mode.

Development, operation and maintenance of&#x0d ropeway between tawang monastery to p t&#x0d tso lake in tawang district in the state of&#x0d arunachal pradesh on hybrid annuity mode.

Read more
Request for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/ contractor under regional office, raipur

Request for pre qualification (rfq) 2025 for the maintenance works to be taken up by authority / risk and cost work of the concessionaire/ contractor under regional office, raipur

Read more
Aam kho divider phoolbagh squre to gda divider r.r. tower divider, bejatall road side open places and infront of manas bhavan road side hedge planteation/greenry with 03 month maintenance file no. 25/25x13/1

Aam kho divider phoolbagh squre to gda divider r.r. tower divider, bejatall road side open places and infront of manas bhavan road side hedge planteation/greenry with 03 month maintenance file no. 25/25x13/1

Read more
Short term maintenance of takhatpur ex. road from km. 26.542 to km. 32.093, mungeli ex. road from km. 45.786 to km. 56.275, pandariya ex. road from km. 82.582 to km. 87.133 and pondi ex. road from km. 103.166 to km. 104.756 on nh130a

Short term maintenance of takhatpur ex. road from km. 26.542 to km. 32.093, mungeli ex. road from km. 45.786 to km. 56.275, pandariya ex. road from km. 82.582 to km. 87.133 and pondi ex. road from km. 103.166 to km. 104.756 on nh130a

Read more
Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh

Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise