Tender Details

Particulars Details
Title
Work Of Removal Of Ash Generated From All Three Fly Arresters/Wet Scrubbers Installed On The Boiler During The Crushing Season And Damping It At Designated Place.
Description
Work Of Removal Of Ash Generated From All Three Fly Arresters/Wet Scrubbers Installed On The Boiler During The Crushing Season And Damping It At Designated Place.
Organisation Kisan Sahkari Chini Mills Ltd. Powayan (Shahjahanpur) | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 590
EMD 10000
Tender Value
Place KSCM POWAYAN
Link

AAAAAAAAAA

Login to view
Start Date June 19, 2025 16:30
End Date

25/06/2025 ( 4 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Insulation, refractory and removal of fly ash, debris from pressure part, ducts, hoppers and roof of pent house etc. during overhauling of unit-03, 3x210 m.w., atps, anpara

Insulation, refractory and removal of fly ash, debris from &amp#x0d pressure part, ducts, hoppers and roof of pent house etc. during &amp#x0d overhauling of unit-03, 3x210 m.w., atps, anpara

Read more
Annual work of sweeping and cleaning in all type of drtain,common roads and work of daily door to door collection of garbage etc. from residential quarters situated in colony premises at atps chachai.

Annual work of sweeping and cleaning in all type of drtain,common roads and work of daily door to door collection of garbage etc. from residential quarters situated in colony premises at atps chachai.

Read more
R/m of civil works of gumma power house for the year 2025-26

Daily removal of trash and boulders from trash rack during rainy season at intake of gumma power house to maintain sufficient water discharge for achieving the maximum generation target.

Read more
Lifting of fly ash from boiler and fly ash arester for season 2025-26

Lifting of fly ash from boiler and fly ash arester &amp#x0d for season 2025-26&amp#x0d

Read more
Work of during the crushing season, the bagasse caring out of the mill is removed from the bagasse carrier and bagasse in fed into the bagasse carrier when ever required and 21kg/cm2 pressure is maintained in boiler till the sugar pressure is compl

Work of during the crushing season, the bagasse caring out of the mill is removed from the bagasse carrier and bagasse in fed into the bagasse carrier when ever required and 21kg/cm2 pressure is maintained in boiler till the sugar pressure is compl

Read more
Work of removal of ash generated from all three fly arresters/wet scrubbers installed on the boiler during the crushing season and damping it at designated place.

Work of removal of ash generated from all three fly arresters/wet scrubbers installed on the boiler during the crushing season and damping it at designated place.

Read more
Work of before the of the crushing season, spread the bagasse from the stock of bagasse available in the bagasse yard and dry it by turning it over system trail of all three boilers and feeding bagasse in the bagasse carrier for running the m

Work of before the of the crushing season, spread the bagasse from the stock of bagasse available in the bagasse yard and dry it by turning it over system trail of all three boilers and feeding bagasse in the bagasse carrier for running the m

Read more
Work of removing ash from furnace and chamber of boiler no. 1,2 and 3 during crushing season and damping it at designated place

Work of removing ash from furnace and chamber of boiler no. 1,2 and 3 during crushing season and damping it at designated place

Read more
Work of (a) removing sugar cane pieces from under the cane carrier chain and cleaning the teeth of chain and sprocket during crushing season (b) picking up the fallen sugar cane from both sides of the cane carrier during crushing season and putting

Work of (a) removing sugar cane pieces from under the cane carrier chain and cleaning the teeth of chain and sprocket during crushing season (b) picking up the fallen sugar cane from both sides of the cane carrier during crushing season and putting

Read more
Tender for executing the work of flushing of cooling water strainer of all three machines round the clock for the period wef 01.07.2025 to 30.09.2025 during the monsoon and post monsoon season of larji hep

Tender for executing the work of flushing of cooling water strainer of all three machines round the clock for the period wef 01.07.2025 to 30.09.2025 during the monsoon and post monsoon season of larji hep

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise