Tender Details

Particulars Details
Title
Repairing, Reconditioning And Repalcment Of Spares For 850 Kw, 6.6 Kv, Ht Motor 04 At Peddapur Ph Iv Pumping Station, Overhauling And Replacements Of Spares For Air Compressor 01 At Ph Iii, Peddapur Including Dismantling, Loading, Transportation, Uploading, Erection,Testing And Commissioning Of Ht Motor And Air Compressor Under Mwss, Eam Cell, Peddapur, Td Ii, Patancheru
Description
Repairing, Reconditioning And Replacements Of Spares For 850 Kw,6.6 Kv,Ht Motor 04 At Peddapur Phase Iv Pumping Station, Overhauling And Replacements Of Spares For Air Compressor 01 At Phase Iii, Peddapur Including Dismantling, Loading, Transportation, Uploading, Erection,Testing And Commissioning Of Ht Motor And Air Compressor Under Mwss, Eam Cell, Peddapur,Transmission Division No.Ii, Patancheru
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id 565165
Reference
Number
EP No.75 /CGM (E)/TC/T1/TD-II/2024-25, Dated: 30-12-2024.
Tender Fee 669
EMD 18894
Tender Value
Place TS
Link http://eprocurement.telangana.gov.in/
Start Date December 30, 2024 22:15
End Date

06/01/2025 ( Expired 126 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rewinding, reconditioning and replacements of spares for 850 kw, 6.6 kv, ht motor at peddapur ph-iv, pumping station, replacements spares for existing pumps at ph-iv, peddapur including dismantling, loading, transportation, unloading, erection, testing and commissioning of and ht motor mwss, eam cell-ii, peddapur under td-ii, patancheru

Rewinding, reconditioning and replacements of spares for 850kw, 6.6kv, ht motor at peddapur phase-iv, pumping station, replacements of spares for existing pumps at phase-iv, peddapur including dismantling, loading, transportation, unloading, erection, testing and commissioning of and ht motor under mwss, eam cell-ii, peddapur, transmission division no-ii, patancheru

Read more
Supply and delivery of major electrical and mechanical major spare components for day to day prive operation and maintennace of 6.6kv/3mw clear water pumping stations, 220/6.6kv substation yards at mallaram under eam cell, td-iv, control room

Supply and delivery of major electrical and mechanical spare components for day to day prive operation and maintenance of 6.6kv/3mw clear water pumping stations, 220/6.6kv substation yards at mallaram under eam cell, transmission division.iv, control room

Read more
E,t,and c of sc pump sets 3 nos of dtrs vcbs, soft ers, cables and dismantling of sc pump sets, cables ht lt panels and transformers whenever it is required emergency pumping from yellampally barrage to murmur intake well at murmur pumping station premises td-iv, control room

Erection testing and commissioning of 18nos x 125hp 90kw and 2nos x 100hp/ 75kw submersible centrifugal pump sets 3 no of 6.6kv/433v 1250kva distribution transformers (dtr)s 12kv 630a vcbs, 415v 1600a acbs soft ers cables and dismantling of 20nos x 125hp 100hp submersible centrifugal pump sets cables ht lt panels and transformers, whenever it is required emergency pumping from yellampally barrage to murmur intake well at murmur pumping station premises under gm(e) trans. division-iv control room.

Read more
Refurbishment and upgradation of existing old system including supply, delivery, erection, testing and commissioning of 3.3kv 503.0 kw, ht motors and mandatory spares for 3.3kv hsc pump sets at rajampet patancheru 6.6kv hsc pumpsets at phase-ii, iii and iv at kalabgoor, peddapur campus and 6.6kv vertical pump sets at intake well, kalabgoor under td-ii, patancheru

Refurbishment and up-gradation of existing old system including supply,delivery,erection,testing and commissioning of 3.3 kv 503.0 kw, ht motors and mandatory spares for 3.3 kv hsc pump sets at rajampet patancheru, 6.6 kv hsc pump sets at phase-ii,iii and iv of kalabgoor,peddapur campus and 6.6kv vertical pump sets at intake well, kalabgoor etc., under manjira drinking water supply scheme of transmission division no.ii, patancheru

Read more
T,e,t comm of 33/6.6kv electrical substation including existing 4 nos of 3150kva power transformers, electrical panels, cabels, 33kv overhead line and all allied equipment to feed the power supply to emergency pumping arrangements at foreshore of nagarjuna sagar near puttamgandi including 4 months mom for substation, dismantling and transportation of all equipment to kpur, npally and gkondla whenever sufficient inflows ed to nagarjunasagar reservoir under eam section, om div.xi, saheb

Transportation, erection, testing and commissioning of 33/6.6 kv electrical substation including existing 4 no of 3150kva power transformers, electrical panels, cables, 33kv over head line and all allied electrical equipement to feed the power supply to emergency pumping arrangements at foreshore of nagarjuna sagar near puttamgandi including 4 months mom for substation, dismantling and transportation of all equipment to kodandapur, nasarlapally and godakondla whenever sufficient inflows ed to nagarjunasagar reservoir, under eam section, electrical sub division,transmission div.iii, sahebnagar

Read more
T e and c of existing 6.6kv, 300 hp bha 700h pumpsets 600 hp submersible pump sets near puttamgandi including mom of pumping station for 4 months and dismantling and transportation of all equipment under td-iii, sahebnagar

Transportation, erection, testing and commissioning of existing 6.6kv, 300hp, bha 700h pump sets, 600hp submersible pump sets and all allied works and formation of bund across the approach main canal to maintain required level in canal for emergency pumping arrangements at foreshore of nagarjunasagar near puttamgandi including mom of pumping station for 4 months and dismantling and transportation of all equipment to kodandapur, nasarlapally and godakondla whenever sufficient inflows ed at nagarjunasagar reservoir under eam section, sd-iv(electrical), transmission div.iii, sahebnagar

Read more
R,t comm of 33 6.6kv, 2500kva ptr sdit and comm of motor ers providing of gabions and formation of bund across main canal to maintain required level in canal for emergency pumping arrangement at foreshore of nagarjunasagar near puttamgandi and also dismantling and transportation of all equipment under td-iii, sahebnagar

Rewinding, testing commissioning of 33 6.6kv, 2500kva ptr ,supply, delivery, installation, testing commissioning of motor ers, air-circuit breaker, repairing of pumps and motors, providing of gabions and formation of bund across the approach main canal to maintain required level in canal for emergency pumping arrangements at foreshore of nagarjunasagar near puttamgandi and also dismantling and transportation of all equipment to kodandapur, nasarlapally and godakondla whenever sufficient inflows ed to nagarjunasagar reservoir under eam section, sub division-iv, transmission div no.iii, sahebnagar

Read more
R t comm of 33 6.6kv 2500kva ptr sdit comm of motor ers providing of gabions and formation of bund across the approach main canal to maintain required level in canal for emergency pumping arrangements at foreshore of nagarjunasagar near puttamgandi under td-iii, sahebnagar

Rewinding, testing commissioning of 33 6.6kv, 2500kva ptr ,supply, delivery, installation, testing commissioning of motor ers, air-circuit breaker, repairing of pumps and motors, providing of gabions and formation of bund across the approach main canal to maintain required level in canal for emergency pumping arrangements at foreshore of nagarjunasagar near puttamgandi and also dismantling and transportation of all equipment to kodandapur, nasarlapally and godakondla whenever sufficient inflows ed to nagarjunasagar reservoir under eam section, sub division-iv, transmission div no.iii, sahebnagar

Read more
Tet nd c 33 6.6kv electrical substation including existing 4 no of 3150 kva power transformer to feed the power supply to emergency pumping arrangements at foreshore of nagarjunasagar near puttamgandi under td-iii, sahebnagar

Transportation, erection, testing and commissioning of 33 6.6 kv electrical substation including existing 4 no of 3150kva power transformers, electrical panels, cables, 33kv over head line and all allied electrical equipement to feed the power supply to emergency pumping arrangements at foreshore of nagarjuna sagar near puttamgandi including 4 months mom for substation,dismantling and transportation of all equipment to kodandapur, nasarlapally and godakondla whenever sufficient inflows ed to nagarjunasagar reservoir, under eam section, electrical sub division,transmission div.iii, sahebnagar

Read more
T,e and c of existing 6.6kv, 300hp, bha700h pump sets, 600hp submersible pump sets near puttamgandi including mom of pumping station of 4 months and dismantling and transportation of all equipmentto kpur, gkondla and under td-iii, sahebnagar

Transportation, erection, testing and commissioning of existing 6.6kv, 300hp, bha 700h pump sets, 600hp submersible pump sets and all allied works and formation of bund across the approach main canal to maintain required level in canal for emergency pumping arrangements at foreshore of nagarjunasagar near puttamgandi including mom of pumping station for 4 months and dismantling and transportation of all equipment to kodandapur, nasarlapally and godakondla whenever sufficient inflows ed at nagarjunasagar reservoir under eam section, sd-iv(electrical), transmission div.iii, sahebnagar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise