Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1st Class Brick Lining Work Of Chhitauni Minor From Km. 0.00 To Km. 0.300 At Chhitauni Pump Canal Including All Cost Of Material (Excluding Cement And Bricks), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Department. As
|
| Description |
1st Class Brick Lining Work Of Chhitauni Minor From Km. 0.00 To Km. 0.300 At Chhitauni Pump Canal Including All Cost Of Material (Excluding Cement And Bricks), Labour, T And P Used Complete In All Respects As Per Drawing Provided By Department. As
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPIDM_817732_13 |
|
Reference Number |
07/EE/MLCD/VND/2023-24 |
| Tender Fee | 766 |
| EMD | 10000 |
| Tender Value | - |
| Place | Executive Engineer Minor lift canal division vns |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | September 15, 2023 19:30 |
| End Date |
Expired
21/09/2023
Expired 1121 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Chipping of carbon bricks and providing new carbon brick lining in strong storage tank c at phosphoric acid plant of fact (cochin division), ambalamedu, kochi.
Chipping of carbon bricks and providing new carbon brick lining in strong storage tank c at phosphoric acid plant of fact (cochin division), ambalamedu, kochi.
Read moreEarth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Earth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Read more1st class brick lining work of chhitauni minor from km. 0.00 to km. 0.300 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department.
1st class brick lining work of chhitauni minor from km. 0.00 to km. 0.300 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department.
Read moreRenovation of 1st class brick brick lining work at main canal from km 0.00 to km. 0.410 at koniya pump canal including all cost of material (excluding cement and bricks), labour, tandp used complete in all respects as per drawing provided by departm
Renovation of 1st class brick brick lining work at main canal from km 0.00 to km. 0.410 at koniya pump canal including all cost of material (excluding cement and bricks), labour, tandp used complete in all respects as per drawing provided by departm
Read moreRenovation of 1st class brick brick lining work at main canal from km 0.00 to km. 0.285 at banbhikhampur pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided
Renovation of 1st class brick brick lining work at main canal from km 0.00 to km. 0.285 at banbhikhampur pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided
Read moreRenovation of 1st class brick brick lining work at main canal from km 0.00 to km. 0.630 at kaurihar pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by dep
Renovation of 1st class brick brick lining work at main canal from km 0.00 to km. 0.630 at kaurihar pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by dep
Read more1st class brick lining work of west canal from km. 0.00 to km. 0.200 at kaurihar pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department.
1st class brick lining work of west canal from km. 0.00 to km. 0.200 at kaurihar pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department.
Read moreRenovation of brick lining work of main canal from 0.00 km. to 0.675 km. at muradev pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department.
Renovation of brick lining work of main canal from 0.00 km. to 0.675 km. at muradev pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department.
Read moreRenovation work of main canal from km. 0.00 to km. 0.800 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engg.
Renovation work of main canal from km. 0.00 to km. 0.800 at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engg.
Read moreConstruction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge. .
Construction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.
Read moreof your Industry type