Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Repairing And Replacement Of Damaged/ Worn Out Gear Coupling, Overhauling And Adjustment Of Intermediate Pinions, Along With Re Alignment And Re Fitting Of Gear Box Of Unit 401 Of Moonidih Coal Washery.
|
Description |
Dismantling, Repairing And Replacement Of Damaged/ Worn Out Gear Coupling, Overhauling And Adjustment Of Intermediate Pinions, Along With Re Alignment And Re Fitting Of Gear Box Of Unit 401 Of Moonidih Coal Washery.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_331068_1 |
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2024-25/E 1718 |
Tender Fee | 0 |
EMD | 6800 |
Tender Value | |
Place | MOONIDIH WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343151 |
Start Date | March 04, 2025 14:30 |
End Date |
10/03/2025 ( Expired 85 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of drag mechanism of 24/96 balram dragline working at nigahi project which includes (a) replacement/repairing of foundationandvertical plates beneath drag intermediate gear wheel, bearing block along with repairing of structural cracks in d
Repairing of drag mechanism of 24/96 balram dragline working at nigahi project which includes (a) replacement/repairing of foundationandvertical plates beneath drag intermediate gear wheel, bearing block along with repairing of structural cracks in d
Read moreRepairing of both side lift cylinder, making of eye and replacement of worn out brake liner with rivets and partial repairing and reinforcement of blade assy. of bd155 dozer sl.no. 13591 of religara project.
Repairing of both side lift cylinder, making of eye and replacement of worn out brake liner with rivets and partial repairing and reinforcement of blade assy. of bd155 dozer sl.no. 13591 of religara project.
Read moreRepairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Read moreRepairing of complete cabin, denting and spray painting of load body, new glass fitting in door and overhauling of gear box, new pressure plate of clutch plate and radiator repairing of tata truck reg. no. br17g 0473 at tetulmari ocp, sijua area.
Repairing of complete cabin, denting and spray painting of load body, new glass fitting in door and overhauling of gear box, new pressure plate of clutch plate and radiator repairing of tata truck reg. no. br17g 0473 at tetulmari ocp, sijua area.
Read moreRepairing of overhead structure along with beam , channel , crisscross and changing of damaged sheets above tail end area of gathering belts no. 1 and 2 at bhojudih coal washery.
Repairing of overhead structure along with beam , channel , crisscross and changing of damaged sheets above tail end area of gathering belts no. 1 and 2 at bhojudih coal washery.
Read moreDemounting crusher roll with dismantling of gear box, bearing block, input shaft, fluid coupling, hollow shaft and fitment of all assy. of elecon feeder breaker no. 01 under dakra project, nk area
Demounting crusher roll with dismantling of gear box, bearing block, input shaft, fluid coupling, hollow shaft and fitment of all assy. of elecon feeder breaker no. 01 under dakra project, nk area
Read moreReplacement of old/damaged lt/ht poles and dismantling of old/faulty underground lt/ ht cables of 1.1kv and 11kv along with jointing and relaying new cables including other miscellaneous works at n s nagar colony bocp within a period of 6 months
Replacement of old/damaged lt/ht poles and dismantling of old/faulty underground lt/ht cables of 1.1kv and 11kv along with jointing and relaying new cables including other miscellaneous works at n s nagar colony , bocp within a period of 6 months
Read moreRepairing/ strengthening of approaching stair case and its support for stairs going up to unit 502, c-1 and c-2 conveyor belt at moonidih coal washery.
Repairing/ strengthening of approaching stair case and its support for stairs going up to unit 502, c-1 and c-2 conveyor belt at moonidih coal washery.
Read moreFabrication and installation of new slider frame after dismantling and removal of existing worn-out slider of slidding pulley of unit c-1 and c-2 belt conveyor at moonidih coal washery.
Fabrication and installation of new slider frame after dismantling and removal of existing worn-out slider of slidding pulley of unit c-1 and c-2 belt conveyor at moonidih coal washery.
Read moreRep. of bucket assembly and changing of 08 nos. tooth point, rep. of adaptor by welding, grinding, along with rep. of edge segment, fabrication of battery box, ladder new making, transmission guard fabrication and dismantling, overhauling at gvp phii
Rep. of bucket assembly and changing of 08 nos. tooth point, rep. of adaptor by welding, grinding, along with rep. of edge segment, fabrication of battery box, ladder new making, transmission guard fabrication and dismantling, overhauling at gvp phii
Read moreof your Industry type