Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
AAAAAAAAAA Login to view |
Description |
Integration Of Power Supply From Ess I Upto Smdb Of 02 Nos Of New Hostels: Sitc If Heat Pump Hot Water Storage Tank I/C Its Accessaries In The 04 New Hostels, Augmentation Of Existing 225 Kld Stp Near Reservoir To 350 Kld And Sitc Of 17 Nos. Of Air Conditioner And 26 Nos. Of Timer For Control Of Air Conditioner At Iim Campus Bodhgaya Sh Sitc Of Street Light Poles
|
Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 11340 |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 18, 2025 23:03 |
End Date |
23/06/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewIntegration of power supply from ess-i upto smdb of 02 nos of new hostels: sitc if heat pump hot water storage tank i/c its accessaries in the 04 new hostels, augmentation of existing 225 kld stp near reservoir to 350 kld and sitc of 17 nos. of air conditioner and 26 nos. of timer for control of air-conditioner at iim campus bodhgaya sh sitc of street light poles
Read moreAAAAAAAAAA
Login to viewConstruction of new stp of 500 kld for existing hostels, new building along with sewer line connection , unfiltered water line distribution and rain beside stadium including operation for 6 months at iim bodhgaya sh c o drain beside stadium and slope reversal of existing drain from old hostel no 4 to auditorium sitc of submersible sewerage pump etc sw balance work
Read more01/nit/sepd/bgpc/2025-26
C/o new stp of 500 kld for existing hostels, new building along with sewer line connection, unfiltered water line distribution and drain beside stadium including operation for 6 months at iim, bodhgaya sh: c/o drain beside stadium and slope reversal of existing drain from old hosted no 4 to auditorium sitc of submersible sewage pump etc.
Read more01/sepd/bgpc/2024-2025
Integration of power supply from ess-i up to smdb of 2 nos. of new hostels, sitc of heat pump hot water storage tank including its accessories in the 04 new hostels, augmentation of existing 225 kld stp near reservoir to 350kld and sitc of 17 nos. of air conditioner and 26 nos. of timer for control of air conditioner at iim campus bodhgaya.
Read moreof your Industry type