Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ktps V Cam Laying Of Fire Crete Cement To The Bottom Ash Hoppers, Fabrication And Replacement Of Refractory Cooling Water Headers And Laying Of 200 Nb Ci Pipes Of Bottom Ash Handling System For Unit 9 During The Overhaul 2025 2026 Reg.
|
| Description |
Ktps V Cam Laying Of Fire Crete Cement To The Bottom Ash Hoppers, Fabrication And Replacement Of Refractory Cooling Water Headers And Laying Of 200 Nb Ci Pipes Of Bottom Ash Handling System For Unit 9 During The Overhaul 2025 2026 Reg.
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 593211 |
|
Reference Number |
e-18/25-26/CAM/SE/OM/V Stage |
| Tender Fee | 79 |
| EMD | 3307 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | May 03, 2025 00:40 |
| End Date |
Expired
17/05/2025
Expired 515 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ktps-vii stage-cam-enquiry for supply of different sizes of butterfly valves in fly ash handling system
Tggenco-ktps-vii stage-cam-enquiry for supply of different sizes of butterfly valves in fly ash handling system
Read moreTggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Tggenco-ktps-vii stage-cam-enquiry for supply of vacuum pump spares(model:gxl 2000) in fly ash handling system
Read moreTtps mech ii bm unit v cleaning of ash deposits from the headers supply tubes hangers in penthouse during overhaul for the year 2026 2027
Ttps mech ii bm unit v cleaning of ash deposits from the headers supply tubes hangers in penthouse during overhaul for the year 2026 2027
Read moreCam-divn:replacement of 200nb ms pipes in cwr pipe line and service water lines in water treatment system as and when required in ktps vii stage
Cam-divn:replacement of 200nb ms pipes in cwr pipe line and service water lines in water treatment system as and when required in ktps vii stage
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreTtps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Ttps mechii ahp plastering of refractory cement inside unit iii bah and removal of ash slag and debris from bah floor and trenches during the forthcoming annual overhaul
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreMtps i m ii unit i to iv plastering of fire crete refractory inside the bottom ash hoppers during annual overhaul 2024 2025.
Mtps i m ii unit i to iv plastering of fire crete refractory inside the bottom ash hoppers during annual overhaul 2024 2025.
Read moreKtps-v stage -cam-reconditioning of clinker grinder rollers of bottom ash hoppers during the year 2026-27
Ktps-v stage -cam-reconditioning of clinker grinder rollers of bottom ash hoppers during the year 2026-27-reg
Read moreof your Industry type