Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Upgradation And Automation Of Mukhya Mantri Abhyudaya Composite Vidyalaya, Hajipur, Block Jamalpur, Mirzapur
|
Description |
Upgradation And Automation Of Mukhya Mantri Abhyudaya Composite Vidyalaya, Hajipur, Block Jamalpur, Mirzapur
|
Organisation | U.P. State Construction and Infrastructure Development Corporation Ltd. | State Govt. and UT |
Tender Id | 2025_SCIDC_1036724_1 |
Reference Number |
08/Tender/EE/MIRZAPUR/2025-26 Date 06.05.2025 |
Tender Fee | 2360 |
EMD | 1.7 Lakh |
Tender Value | |
Place | Composite Vidyalaya, Hajipur, Block- Jamalpur, Mir |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1878276 |
Start Date | May 07, 2025 17:30 |
End Date |
17/05/2025 ( Expired 48 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreRefurbishment upgradation development operation and maintenance of the existing hospital at voc port tuticorin to a 100 bedded super speciality hospital on dbfot basis through ppp
Refurbishment upgradation development operation and maintenance of the existing hospital at voc port tuticorin to a 100 bedded super speciality hospital on dbfot basis through ppp
Read moreSitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Read moreConstruction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreImprovement and upgradation of nh-727a from km 88.670 (rampur bujurg) up border to km 92.992 (mairwa) siwan for the year 2024_25 on epc mode.
Improvement and upgradation of nh-727a from km 88.670 (rampur bujurg) up border to km 92.992 (mairwa) siwan for the year 2024_25 on epc mode.
Read moreUpgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Upgradation, improvement and augmentation of the existing 160 mld salauli water treatment plant upto 240 mld.
Read moreRehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).
Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).
Read moreRehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreof your Industry type