Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Protection And Boulder Pitching Work In Up Stream Of Right Site Reservoir Area Near Pulga Dam Of Parbati Ii Power Station (Package No C 889)
|
| Description |
Protection And Boulder Pitching Work In Up Stream Of Right Site Reservoir Area Near Pulga Dam Of Parbati Ii Power Station (Package No C 889)
|
| Organisation | NHPC Limited | Parbati II Project-NHPC |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 590 |
| EMD | 66000 |
| Tender Value | 33.07 Lakh |
| Place | |
| Link | Login to view |
| Start Date | September 24, 2026 22:30 |
| End Date |
Closing soon
15/10/2026
0 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration and rehabilitation work for dumping site ds-1,ds-2 and ds-3 near pulga dam, barshaini of parbati-h.e. project (stage-ii), (package no-c-775)
Restoration and rehabilitation work for dumping site ds-1,ds-2 and ds-3 near pulga dam, barshaini of parbati-h.e. project (stage-ii), (package no-c-775)
Read moreRehabilitation of up stream right side bank of bisalpur dam
Rehabilitation of up stream right side bank of bisalpur dam
Read moreRehabilitation of up stream right side bank of bisalpur dam
Rehabilitation of up stream right side bank of bisalpur dam
Read moreRepair of damaged u/s boulder pitching of baigul dam between km. 7.500 to 7.800
Repair of damaged u/s boulder pitching of baigul dam between km. 7.500 to 7.800
Read moreTreatment of joint and waterproofing crystalline coating to check the seepage water in dam gallery surface of pulga dam, barshaini of parbati-h.e. project (stage-ii) (package no-c-781)
Treatment of joint and waterproofing crystalline coating to check the seepage water in dam gallery surface of pulga dam, barshaini of parbati-h.e. project (stage-ii) (package no-c-781)
Read moreConstruction of 01 no. security hut and toilet behind lt panel at pulga dam, barshaini of parbati-h.e. project, stage-ii (package no. c-693)
Construction of 01 no. security hut and toilet behind lt panel at pulga dam, barshaini of parbati-h.e. project, stage-ii (package no. c-693)
Read moreScour protection work (boulder pitching) at right bank of allahabad branch from km 49.350 to 49.550
Scour protection work (boulder pitching) at right bank of allahabad branch from km 49.350 to 49.550
Read moreRestoration and protection work of collapsed wet stone pitching in right bank of guide wall of lower dam spillway under ppsp site, bagmundi, purulia.
Restoration and protection work of collapsed wet stone pitching in right bank of guide wall of lower dam spillway under ppsp site, bagmundi, purulia.
Read moreProvision of pitching totoe drain at down stream of dam of swasin m i tank tq mangrulpir dist washim
Provision of pitching totoe drain at down stream of dam of swasin m i tank tq mangrulpir dist washim
Read moreConstruction of damage wire create near relief well on right side down stream of pandoh dam
Construction of damage wire create near relief well on right side down stream of pandoh dam
Read moreof your Industry type