Tender Details

Particulars Details
Title
Replacement Of Bucket Elevator Belt,Buckets And Allied Works In Bucket Elevator In Grinding Section Pa Plant
Description
Replacement Of Bucket Elevator Belt,Buckets And Allied Works In Bucket Elevator In Grinding Section Pa Plant
Organisation The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 5000
Tender Value
Place AMBALAMEDU
Link

AAAAAAAAAA

Login to view
Start Date June 17, 2025 20:30
End Date

25/06/2025 ( 5 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)

Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)

Read more
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)

Read more
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode

2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Repair and maintenance of koderma meghatari jh bh border section of nh 20 old nh 31 from km 27.700 to km 47.700 in the state of jharkhand

Repair and maintenance of koderma meghatari jh bh border section of nh 20 old nh 31 from km 27.700 to km 47.700 in the state of jharkhand

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section

Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section

Read more
Loss reduction works under rdss in ut of andaman and nicobar islands

Loss reduction works under rdss in ut of andaman and nicobar islands

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise